Upgradation of Health Infrastructure Building at PHC Mayurjholia of Ranpur Block in the District of Nayagarh under Ama Hospital Institution 2nd Phase 2024-25
CE RW I / RWCIRCLE-BHUBANESWAR / RWDIVISION-NAYAGARH · Nayagarh, Odisha · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹70.5L
- EMD: ₹70K
- Published: 25 Sep 2026
- Closing date: 05 Oct 2026
- Status: open
Description
Upgradation of Health Infrastructure Building at PHC Mayurjholia of Ranpur Block in the District of Nayagarh under Ama Hospital Institution 2nd Phase 2024-25
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Open Tender
- Evaluation: Percentage
- Make in India (MII): No
- MSE preference: No
Line items (22)
- Earth work in excavation of foundation in hard soil in the structures upto 3m depth as per drawing and technical specification clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials, dressing of sides and bottom and backfilling with approved materials — Qty: 201.37 cum
- Providing and filling in foundation and plinth with sand including watering & ramming with cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royalities amount and cost of labour, T&P, etc. required for the work complete as per specification & direction of the Engineer-in-charge. — Qty: 136.96 cum
- Providing and laying of cement concrete of prop. (1:3:6) using 4cm size black hard granite crusher broken stone aggregate including watering, curing and ramming with cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royalities amount, labour charges, T&P etc. required for the work complete as per specification and direction of the Engineer-in-Charge. — Qty: 79.22 cum
- Masonry work using Flyash Bricks of size 250mm X 125mm X 80mm having crushing strength not less than 75 kgs/ cm2 in cement mortar (1:6) in Foundation & Plinth with portland slag cement (PSC) immersing the bricks for minimum 6 hours in water before use with necessary projections, splays, cutting, circular moulding, corbelling etc. including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount, loading and unloading of all materials and all labour for scaffolding, watering and curing, sundries, T&P etc complete as per specification & direction of the Engineer-in-charge. — Qty: 38.09 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 20.21 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 14.89 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 7.74 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 0.28 sqm
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 3.2 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 7.74 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 1.2 sqm
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 3.2 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 7.74 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 7.74 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 7.74 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 1.11 sqm
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 3.2 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 7.74 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 7.74 cum
- R.C.C. work of M-20 grade using 20mm and down graded size black hard granite crusher broken stone chips including hoisting, lowering, laying, compacting concrete, watering & curing for 28 days with centering & shuttering & finishing the exposed surface smooth providing grooves for beads wherever necessary including cost, conveyance, royalities of all materials with additional charges as decieded by the District Administration, DMF & EMF @15% on royality amount & cost of all labour, T&P etc. required for the work complete in all respect but excluding cost of M.S.rods or Tor Steel & binding wires & labour charges for bending & binding & tying the grills as per specification & direction of the Engineer-in-charge. — Qty: 7.74 cum
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- TTPS Operation Circle CAD ACWPH Annual Overhaulinlg DG Set III Attending minor repair works, Dismantling and Cleaning of Heat exchanger, DM water tank and Replacement of Coolant — Civil Works & Infrastructure · Tamil Nadu
- Road renovation work on the Fatehpur Minor from km 2.600 to km 5.400 — Civil Works & Infrastructure · Uttar Pradesh
- Constuction of Community Compost Pit at Purkhu Panchayat Kot Lower A Khass Block Bhalwal — Civil Works & Infrastructure · Jammu and Kashmir · ₹36K
- Facility Management Services - LumpSum Based - Anganwadi Centres — Civil Works & Infrastructure · Jharkhand · ₹25.8Cr
- Upgradation of Arjun Mess consisting of following items along with installation — Civil Works & Infrastructure · Telangana
- Warehousing Service - Per MT - Monthly Basis - Rehiring of Godown under modified PWS scheme at revenue district — Civil Works & Infrastructure · Jharkhand
- Hiring of Third-Party Inspection Agency - Construction / Civil Engineering Works — Civil Works & Infrastructure · Assam