Third Party Quality Assurance for the work Construction of additional two lane Concrete Road leading from JSW Tippler to Sub Station-3 (SS-3) junction and MCHP Settling Pond to Transport Tower-4 (TT-4) of MCHP inside Harbour area.
Paradip Port Trust · Paradip, Odisha · Testing & Calibration Services · open
Key facts
- Tender value: ₹23.0L
- EMD: ₹46K
- Published: 10 Nov 2026
- Closing date: 01 Dec 2026
- Status: open
- Status as of: 14 Nov 2026 04:20 UTC
- Ministry: Ministry of Shipping
- Department: Engineering Department, Paradip Port Trust
- Office: Port Railway Division
Description
Third-party quality supervision, control and assurance services for construction of an additional two-lane concrete road at Paradip Port Trust. The quoted consolidated percentage is on the estimated cost/tender value, inclusive of duties, cess, harbour entry permit charges and other incidentals, excluding GST. Services are required until actual completion of the work. 85% of fees are payable pro rata during execution and the balance 15% after completion and submission of the final report.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage Rate
- Evaluation: Percentage rate
- Make in India (MII): No
- MSE preference: No
Line items (1)
- Third Party Quality Supervision/Control/Assurance Services for the work " Construction of additional two lane Concrete Road leading from JSW Tippler to Sub Station-3(SS-3) junction and MCHP Settling Pond to Transport Tower-4 (TT-4) of MCHP inside Harbour area". (To be quoted as consolidated percentage on estimated cost /tender value inclusive of all duties, cess, harbour entry permit charges, all other incidentals like transport, insurance etc. excluding GST as applicable). N.B-1: (1) The amount shall be inclusive of all prevailing taxes and fees, but excluding GST. (2) Services of Third Party Inspection agency shall be required upto the actual completion of work. (3) No cost adjustment shall be made in case of time over run/ cost over run of the main work in execution period of main project. NB-2: 85% of the total fees shall be paid during execution of work on pro-rata basis of financial progress of work. * Balance 15% shall be paid after actual completion of execution work and final — Qty: 1 Each No.
1 tender document(s) available — sign up to download.
Related tenders
- Proposal for Carrying out Respiration Dust Sampling and Analysis of of Crystalline Silica Quartz — Testing & Calibration Services · Maharashtra · ₹2.0L
- Maintenance and Pigging Service for Oil and Gas Pipelines — Testing & Calibration Services · Odisha · ₹4.2L
- Custom Bid for Services - Eddy current testing of 10percent Condenser tubes of CTPS Unit 7and8 during Overhauling — Testing & Calibration Services · Jharkhand · ₹1.8L
- Third Party Monitoring and Quality Control for Construction of ROB near Hawaipur Railway Station and Bypass Road under SOPD-G — Testing & Calibration Services · Assam · ₹1.1Cr
- Energy Audit Service - Lumpsum Based - Detailed; Distribution Network in Domestic Area — Testing & Calibration Services · Gujarat
- Custom Bid for Services - Co-ordination of annual re verification and stamping of Belt scales and Truck weighbridges for a period of one year — Testing & Calibration Services · Karnataka · ₹1.1L
- Testing Service for On-Board /Commissioned Equipment/ Instrument related to Plant - AS PER ATC — Testing & Calibration Services · Gujarat
- Custom Bid for Services - Contract for Supervision Service for Krohne Make Field Instruments Installed in BPCL KR for TA 26 — Testing & Calibration Services · Kerala