Supply of Solar Equipment and Components for Defence
Indian Army · Bikaner · Power Generation & Renewable Energy · open
Key facts
- Published: 15 Aug 2026
- Closing date: 25 Aug 2026
- Status: open
- Ministry: Ministry of Defence
- Department: Department of Military Affairs
Description
Tender for the procurement of solar plates, flying controllers, plywood, rotating panoramic balls, and tank target paper for the Indian Army under the Ministry of Defence, with a bid validity of 40 days from the end date, scheduled from August 15 to August 25, 2026.
Eligibility & requirements
- Experience required: 2 years
- Past performance: 40%
- Startup relaxation: Yes
- MSE relaxation: Yes
- Documents required: Supporting documents for experience and turnover exemption
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Single Packet Bid
- Evaluation: value wise evaluation
- Make in India (MII): No
- MSE preference: Yes
Line items (5)
- Solar Plate 2 x 4 — Qty: 9 set
- Flying Controller — Qty: 1 set
- Plywood 8 x 4 — Qty: 1 sheet
- Rotating Panoramic Ball
- Tank Target Paper
1 tender document(s) available — sign up to download.
Related tenders
- Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) — Power Generation & Renewable Energy · Maharashtra · ₹5.0L
- 12 Watt White-LED Based Solar Street Lighting System As Per MNRE Specification — Power Generation & Renewable Energy · Maharashtra
- SURVEY,DESIGN FABRICATION SUPPLY INSTALLATION TESTING AND COMMISSIONING OF TOTAL 48.00 KWP — Power Generation & Renewable Energy · Maharashtra
- SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TOTAL 125 KW — Power Generation & Renewable Energy · Maharashtra
- Supply Installation Testing and Commissioning of Total 10 KW of On Grid Connected Rooftop Solar PV Power Plant — Power Generation & Renewable Energy · Maharashtra
- Survey Design Fabrication Supply Installation Testing and Commissioning Of Total 71.57 Kwp Of On Grid Connected Rooftop Solar Pv power Plant including Comprehensive Maintenance Contract CMC For 3 Years — Power Generation & Renewable Energy · Maharashtra
- Survey, Design, Fabrication, Supply, Installation, Testing and Commissioning Of Total 34.55 Kwp Of on Grid Connected Rooftop Solar Pvpower Plant including Comprehensive Maintenance Contract (CMC) For 3 Years — Power Generation & Renewable Energy · Maharashtra
- Solar 25 kw — Power Generation & Renewable Energy · Maharashtra