Supply, erection, testing and commissioning of new 33/11KV Pappapatty substation in Madurai EDC in Madurai Region
TNEB Limited / TANGEDCO · Pappapatty, Tamil Nadu · Civil Works & Infrastructure · open
Key facts
- EMD: ₹1.7L
- Published: 22 Oct 2026
- Closing date: 16 Nov 2026
- Status: open
- Status as of: 09 Nov 2026 04:58 UTC
- Department: TANGEDCO
- Office: CE-Distribution-Madurai
Description
Turnkey work for a new 33/11KV Pappapatty (Thimmanatham) substation in Madurai EDC, including civil works and electrical supply, erection, testing and commissioning. The BOQs include substation structures and plinths, civil construction, electrical panels, transformers, cables, protection equipment and accessories.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Item Rate
- Make in India (MII): No
- MSE preference: No
Line items (228)
- Earthwork excavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders. — Qty: 9.125 cum
- Earthwork excavating and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete. — Qty: 9.125 cum
- Earthwork excavation in medium rock and dense medium rock not requiring blasting. — Qty: 7.82 cum
- Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. — Qty: 2.14 cum
- PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including with out form work cost of all labour, materials, lead, lift, curing, etc., complete. — Qty: 2.14 cum
- PCC 1:2:4 using 12-20mm HBS metal for structure concrete with form work including cost all materials lead, lifts, labour curing etc complete — Qty: 13.21 cum
- PCC 1:2:4 using 12-20mm HBS metal for support structures concrete with out formwork including cost all materials lead, lifts, labour curing etc complete — Qty: 20 cum
- RCC 1:1.5:3 using 12-20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour, lead, lift, etc., complete. — Qty: 2.07 cum
- Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, watering, curing, etc., complete. — Qty: 60.71 sqm
- Colour washing two coats with Exterior Plastic Emulsion paint over one coat of Plastic Emulsion primer for outside wall including cost of all materials, labour, lead, lift, etc., complete. — Qty: 60.71 sqm
- Assembling of various plinth templates for providing concrete including transporting from one plinth to another, alingning fixing to corrrect level and dismatling the templete after concreting including cost of labour, cost of template, lead, lift, etc., complete. — Qty: 5 set
- Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. — Qty: 124.29 kg
- Earthwork excavating and depositing on bank with initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders. — Qty: 10.5 cum
- Earthwork excavating and depositing on bank with initial lead of 10m & initial lift of 2m in soft disintegrated rock laterite soft rock or kankar not requiring blasting, etc., complete. — Qty: 10.5 cum
- Earthwork excavation in medium rock and dense medium rock not requiring blasting. — Qty: 9 cum
- Supplying and filling of M sand in foundation and basement with well watering and consolidation as per specn. including cost of all materials labour, lead, lift, etc., complete. — Qty: 2.5 cum
- PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation including with out form work cost of all labour, materials, lead, lift, curing, etc., complete. — Qty: 2.5 cum
- PCC 1:2:4 using 12-20mm HBS metal for structure concrete with form work including cost all materials lead, lifts, labour curing etc complete — Qty: 6.5 cum
- PCC 1:2:4 using 12-20mm HBS metal for support structures concrete with out formwork including cost all materials lead, lifts, labour curing etc complete — Qty: 25.5 cum
- Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, watering, curing, etc., complete. — Qty: 64.9975 sqm
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Renovation of Dharamshala in New Yadvindra Colony, ward no. 20 at Patiala. — Civil Works & Infrastructure · Punjab · ₹42.2L
- Lining/Relining of water course of Outlet R.D 6000-R of mr. no 4 of Newada Disty Village Talwandi Malik, Khattriwala Distt. Patiala — Civil Works & Infrastructure · Punjab · ₹60.0L
- Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works — Civil Works & Infrastructure · Punjab · ₹60.0L
- Macdamization of road surface at syed Kamalud din Colony wanganpora Eid gah Near UPHC from h/o Ali Mohd upto h/o Nasir Khalel. — Civil Works & Infrastructure · Jammu and Kashmir · ₹15.0L
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Remodelling and renovation Pond Rara Sahib Chowk Somal kheri Np Maloudh — Civil Works & Infrastructure · Punjab · ₹22.3L
- CONST OF STREET BACK SIDE AMRALA PESTICIDE SHOP W-11 — Civil Works & Infrastructure · Punjab · ₹3.1L