SL3 CONSTRUCTION OF GARAGE BUILDING
West Bengal State Marketing Board · Bolpur, West Bengal · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹10.2L
- EMD: ₹20K
- Published: 10 Oct 2026
- Closing date: 27 Oct 2026
- Status: open
- Status as of: 10 Oct 2026 11:09 UTC
- Department: Birbhum Zilla Regulated Market Committee
- Office: Birbhum Zilla Regulated Market Committee
Description
Construction of a garage within the administrative building campus at the Principal Market Yard of Birbhum Zilla Regulated Market Committee, Bolpur. The work includes excavation, filling, concrete and reinforced concrete work, shuttering, reinforcement, brickwork, flooring, plastering, painting and steelwork.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Open Tender
- Evaluation: Percentage
- Make in India (MII): No
- MSE preference: No
Line items (26)
- Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. In any soil — Qty: 22.653 cum
- Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. — Qty: 7.55 cum
- Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. — Qty: 19.781 cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level — Qty: 7.451 cum
- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level — Qty: 7.474 cum
- Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement — Qty: 1.884 cum
- Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement — Qty: 9.676 cum
- Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete — Qty: 13.365 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts — Qty: 41.625 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers — Qty: 50.85 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform — Qty: 46.138 sqm
- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. — Qty: 880.06 kg
- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. — Qty: 1361.19 kg
- Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth — Qty: 4.95 cum
- Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes — Qty: 8.143 cum
- Cement concrete flooring 1:2:4 finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. — Qty: 45 sqm
- 20 mm cement plaster — Qty: 81.328 sqm
- 15 mm cement plaster on the rough side of single or half brick wall — Qty: 86.176 sqm
- Neat cement punning. — Qty: 10.95 sqm
- Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound ) content. — Qty: 86.18 sqm
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- imp. Sarvice lane With Nali from Juhi lal colony in Block No 315/4 Block No 317 in ward 84 Zone 3 — Civil Works & Infrastructure · ₹8.3L
- GENERAL REPAIR WORK AT JOINT DIRECTOR SECONDARY EDUCATION OFFICE UDAIPUR — Civil Works & Infrastructure · Rajasthan · ₹15.0L
- 4 NARSAR KARAHIYA SAMPARK MARG SE JUNIOR HIGH SCHOOL TAK PITCH MARG KA LEPAN ANURAKSHAN (SAMANYA MARAMMAT) KARYA.(HOT MIX) — Civil Works & Infrastructure · Uttar Pradesh · ₹15.3L
- Laying RMC M40 in various streets of transport nagar ward no. 30 — Civil Works & Infrastructure · Punjab · ₹1.8Cr
- Estimate For Laying 315mm Dia UPVC U/G Pipe Line For Outlet RD 13350/R of Shahpurkandi Channel No.3 For Year 2026-27 — Civil Works & Infrastructure · Punjab · ₹51.7L
- In Ward-30 Govind Vihar II, work of drain and interlocking tiles from Harendra house to Omendra house and Pravesh house, Sundar house — Civil Works & Infrastructure · ₹19.1L
- purani nagar panchayat ke sthan par shoping complex cum office dukan no 05 — Civil Works & Infrastructure · Madhya Pradesh · ₹8.0L