REPAIRING AND FITTING FIXING OF ROTATING ASSEMBLY OF PUMP NO.3 AT CHAULPATTY BPS.
Kolkata Municipal Corporation · Kolkata, West Bengal · Repair, Maintenance & AMC Services · open
Key facts
- Tender value: ₹3.6L
- EMD: ₹7K
- Published: 31 Oct 2026
- Closing date: 17 Nov 2026
- Status: open
- Status as of: 03 Nov 2026 05:41 UTC
- Department: Water Supply
- Office: Office of the Executive Engineer (Booster Pumping Station)
Description
Repair and fitting/fixing of the rotating assembly of Pump No. 3 at Chaulpatty Booster Pumping Station, including removal and servicing of the shaft-impeller assembly, sleeves and bearings, metal deposition and machining, testing, transportation, reassembly, alignment and commissioning. Completion is required within 15 days from the date of work order and contract agreement.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Certifications: USG and DP test certificate, Balancing certificate
- Documents required: Credential Certificate, Valid current ITCC, PAN, GST certificate, CC, Prescribed annexures and certificates/statements, Signed technical bid, NIT, instructions to bidders, BOQ, annexures and photocopies, Valid contact number and email address
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Make in India (MII): No
- MSE preference: No
Line items (21)
- DE-COUPLING OF THE HT PUMP FROM DRIVE MOTOR BY REMOVING THE COUPLING BOLTS ETC. WITH CARE & CAUTION AND KEPT THE COUPLING BOLT S IN THE DEPARTMENTAL GODOWN & COMPLETE AS PER DIRECTION OF EIC (MODE OF MEASUREMENT - DRIVE MOTOR WATT X NO. OF POLES / RPM) — Qty: 3221.5 EACH
- REMOVAL OF HORIZONTAL SPLIT TOP VOLUTE AFTER LOOSENING THE NUTS & BOLTS FROM THE BOTTOM VOLUTE OF HT PUMP WITH UTMOST CARE BY USING DEPARTMENTAL OVERHEAD CRANE & KEEP THE TOP VOLUTE AT THE WORKING FLOOR AND AFTER COMPLETION OF THE NECESSARY INSPECTION / WORKS ETC, & AGAIN PLACINGTHE TOP VOLUTE ON THE BOTTOM VOLUTE WITH NECESSARY HYDRAULIC PAPER ETC. ALONG WITH THE SEALING OF BOTHNDE & DE SIDE OF VOLUTE CASING TO PREVENT SUCKING OFAIR & BOLTED UP OF THE TOP & BOTTOM VOLUTE CASING &COMPLETE AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT - DRIVE MOTORS WATT X NO. OF POLES /RPM) — Qty: 3221.5 EACH
- TO & FRO TRANPORTATION OF COMPLETE SHAFTIMPELLER ASSEMBLY FROM PUMP HOUSE WORK SITE TO THE CONTRACTORS' WORKSHOP AND VICE-VERSA INCLUDING LOADING AND UNLOADING WITHPROPER CARE AS PER DIRECTION OF E-I-C. (MODE OFMEASUREMENT ? WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING) — Qty: 1350 KILOGRAM
- TAKEN OUT OF THE SHAFT -IMPELLER ASSEMBLY FROM THE BOTTOM VOLUTE OF THE HT PUMP AND KEPT ON THE PEDESTAL WITH CARE & CAUTION & COMPLETE AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT - WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING) — Qty: 1350 KILOGRAM
- REMOVAL OF HALF COUPLING USING THE HYDRAULIC PULLER & FIXTURE ETC. VERY CAUTIOUSLY FROM THE SHAFT AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF E-I-C. (MODE OF MEASUREMENT - DRIVE MOTORS WATT X NO. OFPOLES / RPM ) — Qty: 3221.5 EACH
- REMOVAL OF SLEEVE BUSHES, STUFFING BOX BUSH,JAM NUTS ETC. FROM THE SHAFT WITH REQUIRED ARRANGEMENT ETC. COMPLETE IN ALL RESPECT AS PER DIRECTION OF E-I-C. ( MODE OF MEASUREMENT- WEIGHT OF SLEEVES, JAM NUTS & STUFFING BOX BUSH). — Qty: 56 KILOGRAM
- REMOVAL OF IMPELLER USING REQUIRED HYDRAULIC PULLER & FIXTURES ETC. VERY CAUTIOUSLY WITHOUT ANY DAMAGE EITHER TO THE SHAFT SURFACE OR THE KEY ETC. WITH ARRANGMENT ETC. COMPLETE IN ALL RESPECT AS PER DIRECTION OF E-I-C. ( MODE OF MEASUREMENT- WEIGHT OF THE IMPELLER WITH SHAFT). — Qty: 1000 KILOGRAM
- TAKING OUT THE BEARINGS (HAVING ID-75MM TO 200MM) WITH PROPER CARE & CAUTION BY PROVIDING ALL REVELENT TOOLS & FIXTURES AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.[MODE OF MEASUREMENT -{ NO. OF BEARING*(THICKNESS OF BEARING MULTIPLIED BY SUM OF ID & OD OF THE BEARINGS)}] — Qty: 362.26 SQUARE CENTIMETER
- PREPARATION OF ERODED SURFACE AND DO NEEDFUL FOR SURFACE DEVELOPMENT BY METAL DEPOSITION / MACHINING ELECTRODE ON THE PITTED/ERODED PORTION AND MACHINING AND FINISHING THE SHAFT SLEEVE BOTH ON DE & NDE MADE UP OF SS-304 ETC COMPLETE AS PER DIRECTION OF EIC . {MODE OF MEASUREMENT: THE AREA OF THE ERODED PORTION ONLY I.E ? X D X AXIAL ERODED LENGTH X MAXIMUM DEPTH OF THE ERODED SLEEVE SURFACE} — Qty: 11.7825 CUBIC CENTIMETER
- ULTRA SONO-GRAPHY /DIE-PENETRATION (USG & DP TEST) TEST TO CHECK THE DEFECT /CRACK OF SHAFT MATERIAL & TESTING CERTIFICATE TO BE FURNISHED, OBTAINED FROM THE COMPONENT AUTHORITY & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC (MODE OF MEASUREMENT - LENGTH OF THE SHAFT) — Qty: 1.85 METER
- FITTING & FIXING OF THE IMPELLER BY HYDRAULIC JACK & SPECILIZED FIXTURES ETC. AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF E-I-C. (MODE OF MEASUREMENT- WEIGHT OF THE SHAFT-IMPELLER ASSEMBLY). — Qty: 1000 KILOGRAM
- FITTING & FIXING OF THE SLEEVES / JAM NUTS / STUFFING BOX BUSH / WEARING RING BY HYDRAULIC JACK & SPECIALIZED FIXTURES ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. ( MODE OF MEASUREMENT - WEIGHT OF THE SLEEVES / JAM NUTS / STUFFING BOX BUSH / WEARING RING WITH SHAFT) — Qty: 73 KILOGRAM
- TRUNESS AND ECENTRICITY CHECKING OF THE SHAFT-IMPELLER ASSEMBLY, TRUNESS CHECKING OF THE COUPLING AND DYNAMIC BALANCING THE COMPLETE ASSEMBLY BY ADDING OR REMOVING THE UNBALANCE MASS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF E-I-C.THE BALANCING CERTIFICATE MUST BE FURNISHED TO THE DEPARTMENT. ( MODE OF MEASUREMENT- WEIGHT OF ROTATING ASSEMBLY) [SHAFT + IMPELLER + SLEEVE + JAM NUT]) — Qty: 1350 KILOGRAM
- FITTING FIXING OF THE BALL/ROLLER BEARING (HAVING ID-75MM TO 200MM) BY APPLYING THE METHOD OF EXPANSION OF INNER RACE IN HOT OIL DIPPING OR OTHER SUITABLE METHOD OF EXPANSION WITH PROPER CARE & CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. .[MODE OF MEASUREMENT -{ NO. OF BEARING*(THICKNESS OF BEARING MULTIPLIED BY SUM OF ID & OD OF THE BEARINGS)}] — Qty: 362.26 SQUARE CENTIMETER
- FITTING & FIXING THE HALF COUPLING BY HYDRAULIC JACK & SPECILIZED FIXTURES ETC. AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF E-I-C. (MODE OF MEASUREMENT- DRIVE MOTORS WATT X NO. OF POLES / RPM). — Qty: 3221.5 EACH
- POSITIONING, FITTING & FIXING THE COMPLETE ROTATING ASSEMBLY ON THE PUMP BOTTOM VOLUTE WITH ALL SEQUENTIAL PROCEEDINGS AND KEEPING UTMOST CARE AND CAUTION AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF E.I.C. (MODE OF MEASUREMENT- WEIGHT OF IMPELLER, SHAFT, SLEEVE, JAM NUT & HALF COUPLING). — Qty: 1350 KILOGRAM
- SEQUENTIAL INSERTION OF PACKINGS (PTFE HYDRAULIC PACKING STYLE-374 SIZE 15.5 TO 25MM AT BOTH END (DE & NDE SIDES) & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (MODE OF MEASUREMENT-INSERTED PACKING LENTH IN M*NO OF TURNS) — Qty: 4.713 METER
- MAKING ALLIGNMENT OF THE SHAFTS OF PUMP & MOTOR BY USING DIAL GAUGES ETC., INCLUDING INSERTION OF REQUISITE DIMENTIONED BRASS SHEETS COMPLETE IN ALL RESPECT AS PER DIRECTION OF E.I.C. (MODE OF MEASUREMENT - DRIVE MOTORS WATT X NO. OF POLES / RPM) — Qty: 3221.5 EACH
- MAKING COUPLING THE HT PUMP WITH THE DRIVE MOTOR BY INSERTING THE COUPLING PINS ETC WITH PROPER CARE & CAUTION & COMPLETE AS PER DIRECTION OF EIC.(MODE OF MEASUREMENT - DRIVE MOTOR WATT X NO. OF POLES / RPM) — Qty: 3221.5 EACH
- COMMISSIONING THE HT PUMP WITH DRIVE MOTOR WITH SEQUENTIAL PROCESS WITH PROPER CARE & CAUTION & DO NEEDFUL OBSERVATION FOR TRIAL RUN TO ACHIEVE THE SATISFACTORY OPERATION OF THE PUMP & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. (MODE OF MEASUREMENT -PER DAY BASIS) — Qty: 2 DAYS
2 tender document(s) available — sign up to download.
Related tenders
- KANDRI/ENGG/PUR/2026-27/ 1909 — Repair, Maintenance & AMC Services · Maharashtra · ₹1.4L
- AMC of Cooling Equipments of NPM — Repair, Maintenance & AMC Services · Odisha · ₹6.5L
- Repair and Maintenance Jobs in Unloading and Screening Area of RMHP — Repair, Maintenance & AMC Services · Odisha · ₹53.2L
- Service Engineering Visit for Maintenance of Van Mounted Cable Fault Locator — Repair, Maintenance & AMC Services · Odisha · ₹2.7L
- Emergency Visit for ABB Drives and Automation System — Repair, Maintenance & AMC Services · Odisha · ₹58.4L
- Cylinder Maintenance and Handling Service — Repair, Maintenance & AMC Services · Gujarat · ₹3.1Cr
- THREE YEAR ARC FOR SUPERVISION OF OVERHAULING/SERVICING OF M/S INSTRUMENTATION LIMITED (IL) VALVES AT BPCL KOCHI REFINERY — Repair, Maintenance & AMC Services · Kerala
- THREE YEAR ARC FOR SUPERVISION OF OVERHAULING/SERVICING OF M/S SAMSON VALVES & POSITIONERS, BPCL KOCHI REFINERY — Repair, Maintenance & AMC Services · Kerala