Renovation of Toilets in Anusandhan Bhawan
Centre for Development of Advanced Computing (C-DAC) · Noida, Uttar Pradesh · Civil Works & Infrastructure · open
Key facts
- EMD: ₹2.5L
- Published: 11 Nov 2026
- Closing date: 30 Nov 2026
- Status: open
- Status as of: 14 Nov 2026 04:27 UTC
- Ministry: Ministry of Electronics and Information Technology
- Department: Department of Electronics and Information Technology
- Office: C-DAC, Noida
Description
Renovation and modernization of 12 toilet blocks from the ground floor to the fifth floor at Anusandhan Bhawan, C-DAC Noida. The work includes demolition, civil and structural refurbishment, plumbing, electrical works, new sanitary ware and fixtures, and phased floor-wise execution to maintain office operations.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Documents required: Work order or satisfactory completion certificates issued by the client, indicating the value of work, GST registration, PAN, Site visit report in Annexure-D certified by C-DAC, Relevant MSE or Startup certificates, if submitting a Bid Security Declaration in place of EMD
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Two bid system
- Evaluation: Item Wise
- Make in India (MII): No
- MSE preference: No
Line items (124)
- Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. Note - item to be applicable in urban areas having directions for restricted hours for movement/ plying of load carrying motor vehicle of 3.5 cum or more. — Qty: 90 Cum
- Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : 1. Brick Quality: Use bricks with compressive strength and soak them in water for 10–15 minutes before laying to prevent absorption of water from the mortar. 2. Mortar Mix & Application: Use a 1:4 cement-sand ratio. Ensure all vertical and horizontal joints are filled completely, with a maximum joint thickness of 10–12 mm. 3. Bond & Alignment: Use English Bond (alternating headers and stretchers) for maximum strength. Ensure a fair-face finish on both sides, with true and plumb vertical alignment. 4. Construction Height: Do not raise walls more than 1.5 meters per day to prevent sagging and mortar deformation. 5. Curing: Cure the brickwork for at least 7-10 days to ensure proper strength gain. 6. Scaffolding: Use robust double scaffolding that does not restrict the alignment or quality of the brickwork. — Qty: 16 Cum
- Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level: 1. Brick Selection & Preparation: Use high-quality, fully burnt bricks. Soak them in water for at least 1–2 hours before use to prevent them from absorbing water from the mortar. 2. Mortar Mix & Joints: Use a 1:4 cement-sand mix. Keep vertical and horizontal joints between 10mm and 12mm thick to ensure stability. 3. Reinforcement: To prevent cracking, insert reinforcing materials such as 6mm or 8mm diameter mild steel bars, hoop iron, or expanded mesh every third or fourth course, properly anchored into the main structure. 4. Structural Stability (115 mm Walls): 4a. Max Height: Raise the wall no more than 1.5 meters per day to prevent buckling. 4b. Structural Connection: Install concrete stiffener columns (tie-columns) at intervals, usually every 2.5 meters or at corners, to provide lateral stability. 4c. Raking Joints: Rake the mortar — Qty: 163 Sqm
- Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at every third course of half brick masonry. — Qty: 163 Sqm
- Providing and fixing 18 mm thick gang saw cut, Granite stone mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite stone slab all colour and texture except black, Cherry/Ruby red Area of slab upto 0.50 sqm — Qty: 21 Sqm
- Providing edge moulding to 18 mm thick granite stone counters, Vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge. Granite work — Qty: 15 Meter
- Extra for fixing granite stone, over and above corresponding basic item, in facia and drops of width upto 150 mm with epoxy resin based adhesive, including cleaning machine polishing to edge to give high gloss finish etc. complete. — Qty: 15 Meter
- Extra for providing opening of required size & shape for wash basin/ kitchen sink in kitchen platform, vanity counter and similar location in Granite/ stone work, including necessary holes for pillar taps etc. including moulding, rubbing and polishing of cut edges etc. complete. — Qty: 22 Each
- Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). Second class teak wood Material Selection: Use kiln-seasoned hardwood to prevent warping and decay, especially for exterior doors. Structural Integrity: Use heavy-duty, rust-resistant fasteners to fix the frame, ensuring it is properly anchored to the wall to carry the weight of the door. Precision Installation: Level & Plumb: Use shims and a spirit level to ensure the frame is perfectly vertical and horizontal. Check Squareness: Measure diagonals to ensure the frame is perfectly square. Spacing: Leave a small, uniform gap (roughly 3mm or1/8-inch) on all three sides for expansion. Moisture Protection: Apply wood preservatives, sealants, or primer to the entire frame before installation, especially on the bottom where it meets the floor — Qty: 0.6 Cum
- Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters: 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws as follows: Moisture Conditioning: Store the door in the environment where it will be installed for 48 hours before fitting to allow it to acclimate, reducing the risk of swelling or shrinking. Framing Alignment: Ensure the door frame is perfectly square and level. The shutter should have a clearance of roughly 2mm to 3mm from the frame on all sides for smooth operation. Hinge Installation: Use high-quality hardware. For a typical 35mm door, 4 to 5 stainless steel hinges are recommended to prevent sagging. Painting/Finishing: Apply paint or veneer to the top and bottom edges (not just the faces) to prevent moisture from en — Qty: 26 Sqm
- Extra for providing lipping with 2nd class teak wood battens 25 mm minimum depth on all edges of flush door shutters (over all area of door shutter to be measured). — Qty: 26 Sqm
- Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : Size 250x10 mm — Qty: 30 Each
- Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. — Qty: 12 Each
- Providing and fixing aluminium die cast body tubular type universal hydraulic door closer (having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm), with necessary accessories and screws etc. complete. — Qty: 12 Each
- Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. — Qty: 30 Each
- Providing and fixing high security SS202 Cylindrical lock with computer key backset 60mm, SS Finish of approved quality with necessary screws etc. complete. Make- Doorset, Godrej, Harrison — Qty: 18 Each
- Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge with Polished Granite stone slab colour of Black, Cherry/Ruby Red or equivalent. Preparation and Substrate 1. Subfloor Inspection: The surface must be clean, dry, and free of dust, oil, and loose debris. 2. Levelling: Ensure the subfloor is perfectly levelled before beginning the installation. Use cement mortar (1:6 ratio) to create a level bedding, typically 20 mm thick below the slab. Installation Method 3. Cement Slurry: Apply a cement slurry over the mortar bed befor — Qty: 87 Sqm
- Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622, of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. Size 1200x600 mm (Base Rate Rs: 80 Per Sqft) Makes:- (i) Johnson, (ii) Kajaria, (iii) Somany Preparation and Planning 1. Surface Preparation: Ensure the wall is clean, dry, and smooth. Use water-resistant backer board (cement board) for wet areas like showers. 2. Layout Planning: Start from the center of the wall to avoid thin, awkward slices at the corners. Use a level to mark horizontal and vertical reference lines. 3. Tile Inspection: Check all tiles for chips or defects before installing. Installation Techniques 4. Adhesive Selection: U — Qty: 407 Sqm
- Providing and fixing dry cladding upto 25 metre heights with 18mm thick gang saw cut stone with machine cut edges of uniform colour and size upto 1mx1m, fixed to structural steel frame work and/ or with the help of cramps, pins etc. and sealing the joints with approved weather sealant as per Architectural drawing and direction of Engineer-in-charge. (The steel frame work, stainless steel cramps and pins etc. shall be paid for separately). Substrate Preparation: Ensure the wall is clean, dry, and capable of holding the weight. Adhesive Choice: Use a high-quality flexible adhesive designed for natural stone and apply it in a full bed rather than dot-and-dab to prevent air pockets. Dry Hanging Technology: For large stones, utilize proper anchoring methods (metal fasteners/hangers) that provide a 2 cm drainage gap to prevent water damage. Site Planning: Pre-plan your layout and, according to, verify stone sizes for precision. Stone Selection: Choose appropriate stones for the environment, — Qty: 54 Sqm
- 12 mm cement plaster of mix 1:4 (1 cement: 4 coarse sand) as follows: 1. Surface Preparation: Thoroughly clean masonry surfaces of dust, oil, and loose mortar. Roughen the surface to provide a mechanical bond for the plaster. 2. Dampen Surfaces: Soak the wall thoroughly with water at least 6 hours before plastering to prevent the brickwork from sucking water out of the mortar. 3. Mortar Mix Ratio: Use a 1:4 (1 part cement, 4 parts sand) ratio for a stronger, more durable finish 4. Application: Apply in a single coat to 12mm thickness, ensuring a smooth, true vertical surface using a plumb bob. 5. Curing: Maintain moist conditions for at least 7 days to ensure strength and prevent premature drying. 6. Materials: Use clean sand with less than 8% silt content. PPC is preferred over OPC for better crack resistance. 7. Joint Reinforcement: Utilize chicken wire mesh at joints between concrete and brickwork to minimize cracking. — Qty: 825 Sqm
2 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Improvement such as widening and strengthening of Lalitgiri Museum to Kalianti Bridge via Haribhaktapur-Jerakanda road from 0/000 km to 7/575 km in the district of Kataka under State Plan — Civil Works & Infrastructure · Odisha · ₹20.6Cr
- Renovation of Dharamshala in New Yadvindra Colony, ward no. 20 at Patiala. — Civil Works & Infrastructure · Punjab · ₹42.2L
- Lining/Relining of water course of Outlet R.D 6000-R of mr. no 4 of Newada Disty Village Talwandi Malik, Khattriwala Distt. Patiala — Civil Works & Infrastructure · Punjab · ₹60.0L
- Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works — Civil Works & Infrastructure · Punjab · ₹60.0L
- Macdamization of road surface at syed Kamalud din Colony wanganpora Eid gah Near UPHC from h/o Ali Mohd upto h/o Nasir Khalel. — Civil Works & Infrastructure · Jammu and Kashmir · ₹15.0L
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Remodelling and renovation Pond Rara Sahib Chowk Somal kheri Np Maloudh — Civil Works & Infrastructure · Punjab · ₹22.3L