Reconstruction of Manushmuria of Bahragora to Darishol Chowk Road total length 10.274 km for the year 2025-26
Road Construction Department · Jamshedpur, Jharkhand · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹43.8Cr
- EMD: ₹43.8L
- Published: 28 Oct 2026
- Closing date: 27 Nov 2026
- Status: open
- Status as of: 06 Nov 2026 04:02 UTC
- Department: Road Construction Department, Government of Jharkhand
- Office: Road Division, Jamshedpur
Description
Item-rate works tender for reconstruction of the 10.274 km Manushmuria of Bahragora to Darishol Chowk Road in Jamshedpur Division, Jharkhand. Estimated cost is Rs. 43,78,04,317.35 and the completion period is 14 months.
Eligibility & requirements
- Past performance: 90%
- Startup relaxation: No
- MSE relaxation: No
- Documents required: Documents defining the constitution or legal status, place of registration, and principal place of business, Power of attorney of the bid signatory, Details of total monetary value of construction work performed for each of the last five years, Details of similar works completed for each of the last five years and works underway or contractually committed, Details of major construction equipment proposed for the contract, Qualifications and experience of key site management and technical personnel, Profit and loss statements and auditor's reports for the past five years, Bank-certified evidence of access to lines of credit and other financial resources, Undertaking to invest cash up to 25% of the contract value during implementation, Authority to seek references from the bidder's bankers, Information regarding current or recent litigation, Subcontracting proposals and subcontractor qualifications for components exceeding 10% of the bid price, Proposed construction methodology and programme, equipment planning, deployment, and quality control procedures, Joint Venture Agreement or letter of intent and proposed agreement, if bidding as a joint venture
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Item Rate
- Evaluation: Item rate
- Make in India (MII): No
- MSE preference: No
Line items (86)
- Clearing and Grubbing the road land,(Clearing and grubbing the road land including uprooting rank vegetation,grass,bushes,shrubs,saplings and trees girth upto 300mm ,removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of sercviceable materials to be used or auctioned upto a lead of 1000 mts. including removal and disposal of organic soil not exceeding 150mm in thickness.RCD S.O.R.2.03(i)A — Qty: 7.82 per hect
- Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.RCD S.O.R.2.01(A+B)(ii)600-900 mm — Qty: 65 Each
- Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.RCD S.O.R.2.01(A+B)(iii)900-1800mm — Qty: 176 Each
- Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.RCD S.O.R.2.01(A+B)(iv)>1800mm — Qty: 94 Each
- Removal of telephone / Electric poles including excavation and dismantling of foundation concrete and lines under the supervision of concerned department, disposal with all lifts and up to a lead of 1000 metres and stacking the serviceable and unserviceable material separately.RCD S.O.R.2.14 — Qty: 19 Each
- Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. RCD SOR 2.04 (iii) (I) By manual means. (B) Rubble stone masonry in cement mortar — Qty: 1609.34 per m3
- Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. RCD SOR 2.04 (i) (I) By manual means. (B) Cement concrete Grade M-15 & M-20 — Qty: 141.18 per m3
- Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres. RCD SOR 2.04 (i) (II) By Mechanical means . (B) Prestressed/ Reinforced cement concrete grade M-20 & above — Qty: 81 per m3
- Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. RCD SOR 2.04 (ix) B Above 600mm to 900mm dia — Qty: 90 per m
- Scarifying the existing bituminous surface to a depth of 50 mm and disposal of scarified material within all the lifts and leads upto 1000 metres. RCD SOR 3.15 (i) By Mechanaical Means using Hydraulic excavator — Qty: 33376 per m2
- Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) RCD SOR 2.06 — Qty: 317.1 per m3
- Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (including royality @ Rs.27.48 per including watering, rolling & compaction) RCD SOR 3.06 — Qty: 2608.85 per m3
- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. Rate per cum after adding royalty@Rs 27.48/cum RCD SOR 3.17 — Qty: 8324.85 per m3
- Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. RCD SOR 3.16 — Qty: 121614.74 per m3
- Construction of subgrade/earthen shoulder with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. RCD SOR 3.18 — Qty: 13585.54 per m3
- Construction of granular sub base by providing coarse graded material @ 1.28 m3 / m3 , spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause401. As per MORT&H specification401 (5th revision) and direction of E/I RCD SOR 4.01 B(v) — Qty: 16111.7 per m3
- Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) RCD SOR 4.14B — Qty: 14986.38 per m3
- Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of the road surface and spraying primer @0.60 kg/sqm using mechanical means . As per MOSRT&H specification 502 (5th revision ) & as per direction of E/I. RCD SOR 5.01A — Qty: 60815.51 per m2
- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @0.20 kg/sqm on the prepared bituminous surface cleaned with mechanical broom. As per MOSRT&H specification 502 (5th revision ) & as per direction of E/I. RCD SOR (i) — Qty: 56844.88 per m2
- Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor @0.25 kg/sqm on the prepared Granular surface cleaned with mechanical broom. As per MOSRT&H specification 502 (5th revision ) & as per direction of E/I. RCD SOR 5.02(ii) — Qty: 56844.88 per m2
2 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Construction of Mali Hut at Bimalnag Nursery under CAMPA CAT RATTLE for the year 2026 27 — Civil Works & Infrastructure · Jammu and Kashmir · ₹16.7L
- CONSTRUCTION OF TOILET BLOCK IN SANOUR CITY — Civil Works & Infrastructure · Punjab · ₹9.1L
- Construction of Segregation Shed and Community Compost Pit at K.N.Savulur H/O K.Naduhalli — Civil Works & Infrastructure · Tamil Nadu · ₹4.0L
- Repair of street and drainage in w.no.2 — Civil Works & Infrastructure · Punjab · ₹25.0L
- Repair and renovation of University Library Building at GADVASU, Ludhiana. — Civil Works & Infrastructure · Punjab · ₹9.5L
- P/F Interlocking Tiles St. Baba Jora EO Gurudwara Street Ward No.07 — Civil Works & Infrastructure · Punjab · ₹3.4L