Reconstruction of ledge for godown at State Warehouse Choondy Aluva in Ernakulam District
Kerala State Warehousing Corporation · Aluva, Kerala · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹3.5L
- EMD: ₹9K
- Published: 07 Oct 2026
- Closing date: 17 Nov 2026
- Status: open
- Status as of: 10 Nov 2026 04:24 UTC
- Department: Construction Section
- Office: Managing Director, Kerala State Warehousing Corporation, Ernakulam
Description
Reconstruction of a godown ledge at State Warehouse, Choondy, Aluva, Ernakulam District. Estimated cost is Rs. 3,46,352 excluding GST, with a completion period of 60 days. Bidders must have completed at least one qualifying civil work costing more than 40% of the estimated cost within the last five years or as specified in the tender conditions.
Eligibility & requirements
- Past performance: 40%
- Startup relaxation: No
- MSE relaxation: No
- Documents required: Certificate from the agreement executing authority for qualifying completed work, including name of work, agreement number, start and completion dates, and completed amount, Experience certificate in the prescribed format, Scanned image of preliminary agreement executed on white paper, Details of bank account having core banking facility and contractor email address, Valid and active contractor registration, Digital Signature Certificate
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Item Rate
- Evaluation: Price bid of only pre-qualified bidders shall be opened; price bid opening date and time will be intimated to pre-qualified bidders
- Make in India (MII): No
- MSE preference: No
Line items (18)
- Ledge repair works Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Enginneer - in -charge — Qty: 3.2 cum
- Dismantling existing wooden fenders up to 50 metres span and 2 metres height including stacking the material within 50 metres lead: of sectional area 40 square centimetres and above — Qty: 35.5 metre
- Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road — Qty: 9.6 sqm
- Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil — Qty: 4.8 cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) including cost and conveyance of all materials, labour charges, etc. complete as required. — Qty: 1 cum
- Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) including cost and conveyance of all materials, labour charges, etc complete. — Qty: 2.6 cum
- Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform including cost and conveyance of all materials, scaffolding charges labour charges, etc. complete as required. — Qty: 50 sqm
- Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) including cost and conveyance of all materials, labour charges, scaffolding etc. complete as required. — Qty: 1.4 cum
- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) including cost and conveyance of all materials, labour charges, etc. complete as required. — Qty: 3.2 cum
- Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more — Qty: 460 kg
- 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) including all cost and conveyance of all materials, labour charges, scaffoldings, etc complete — Qty: 35 sqm
- 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost and conveyance of all materials, labour charges, scaffoldings, etc complete — Qty: 63.5 sqm
- Providing 16mm dia L bolts for fixing the C channel as fender to the bottom ledge with M.S rod 50 cm long including charges for supplying nuts, threading,bending and pacing in position as per instruction during execution including cost conveyance of all materials, labourcharges etc. complete — Qty: 36 nos
- Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand). Including cost conveyance of all materials, labour charges, scaffoldings etc. complete as per directions from the Engineer in charge. — Qty: 20 sqm
- Structural steel in single section fixed with or without connecting plate including cutting, hoisting, fixing in position by using C Channel size 150x100x5mm and applying a priming coat of approved steel primer all complete.as per direction of Engineer in charge. — Qty: 639 kg
- Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications after preparing the surface by using wirebrush or emery paper , including appropriate priming coat, preparation of surface, etc. complete.On steel work. All works including cost and conveyance of all materials, labour charges, scaffolding etc. complete as required. — Qty: 25.5 sqm
- Applying two coat of water thinnable cement primer of approved brand and manufacture on wall surface after preparing the surface by using wirebrush or emery paper. All works including cost and conveyance of all materials,labour charges, scaffolding etc. complete as required. — Qty: 35 sqm
- Engaging coolies for dismantling, clearing debris, repair and clearing the area as per direction from the Engineer in Charge. — Qty: 2 nos
4 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Improvement such as widening and strengthening of Lalitgiri Museum to Kalianti Bridge via Haribhaktapur-Jerakanda road from 0/000 km to 7/575 km in the district of Kataka under State Plan — Civil Works & Infrastructure · Odisha · ₹20.6Cr
- Renovation of Dharamshala in New Yadvindra Colony, ward no. 20 at Patiala. — Civil Works & Infrastructure · Punjab · ₹42.2L
- Lining/Relining of water course of Outlet R.D 6000-R of mr. no 4 of Newada Disty Village Talwandi Malik, Khattriwala Distt. Patiala — Civil Works & Infrastructure · Punjab · ₹60.0L
- Outsourcing of Labour Part for Erection, Testing Commissioning of New 11KVLT/HTLines on Rail/PCC Poles, Distribution T/Fs, Augmentation/Sagging of ACSR of HT/LT Lines, Cables laying, Guarding, Stay Setfor Various Works — Civil Works & Infrastructure · Punjab · ₹60.0L
- Macdamization of road surface at syed Kamalud din Colony wanganpora Eid gah Near UPHC from h/o Ali Mohd upto h/o Nasir Khalel. — Civil Works & Infrastructure · Jammu and Kashmir · ₹15.0L
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Remodelling and renovation Pond Rara Sahib Chowk Somal kheri Np Maloudh — Civil Works & Infrastructure · Punjab · ₹22.3L