Preparation of Fire Drawings and BOQ for Implementation of Fire Protection System at IRERC
Irel (india) Limited · Chavara · Fire, Safety & PPE · open
Key facts
- Tender value: ₹1.9L
- Published: 18 Aug 2026
- Closing date: 07 Sep 2026
- Status: open
- Ministry: Department of Atomic Energy
- Office: Ho
Description
Tender for the preparation of fire drawings and bill of quantities for implementing fire safety systems at IRERC, including submission of documents for fire NoC.
Eligibility & requirements
- Experience required: 7 years
- Startup relaxation: Yes
- MSE relaxation: Yes
- Documents required: Experience Criteria, Certificate
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Two Packet Bid
- Evaluation: Total value wise evaluation
- Make in India (MII): Yes
- MSE preference: No
Line items (1)
- Custom Bid for Services - Lumpsum charges for Preparation of Fire Drawings and BoQ for implementing Fire Safety system in IRERC buildings including submission of all necessary documents to obtain initial Fire NoC for buildings from Fire and Rescue D.
1 tender document(s) available — sign up to download.
Related tenders
- FIRE RETARDANT TWO PIECE WELDER SUIT (SHIRT & TROUSER), COLOR:- ORANGE, OTHER DETAILS/ SPECIFICATION AS PER ANNEXURE-1, MAKE - SURE Safety/UDYOGI/WELDSTAR/ARMSTRONG OR SIMILAR. (1 SET CONSISTS OF 1 NO. SHIRT & 1 NO.TROUSER). NOTE - SIZE-WISE BIFURCATION SHALL BE PROVIDED AFTER PLACEMENT OF THE PURCHASE ORDER. — Fire, Safety & PPE · Maharashtra · ₹19K
- Charge Fire Extinguisher Dry Powder 25 or 50 or 75 kg CO2, Water Type Carbon — Fire, Safety & PPE
- Fire Hoses with Delivery Coupling — Fire, Safety & PPE · Maharashtra · ₹1.2L
- Fire Retardant Coat — Fire, Safety & PPE · Bihar
- Fire Breathing Apparatus SCBA as per IS 10245 (Part 2) — Fire, Safety & PPE · Andhra Pradesh · ₹1.1L
- Fog or Mist Generators — Fire, Safety & PPE · Jharkhand
- Portable Fire Extinguishers (V3) ISI Marked to IS 15683 — Fire, Safety & PPE · Jammu and Kashmir · ₹1.9L
- Refillable Seamless Steel Gas Cylinders — Fire, Safety & PPE