Modification of tanker filling point to improve safety at tanker points of Dudhichua Project
Northern Coalfields Limited · Dudhichua Project, Uttar Pradesh · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹1.4Cr
- EMD: ₹1.7L
- Published: 13 Oct 2026
- Closing date: 30 Oct 2026
- Status: open
- Status as of: 18 Oct 2026 23:04 UTC
- Office: Dudichua Project
Description
Civil works to modify tanker filling points at Dudhichua Project to improve safety. The BOQ includes excavation, concrete and structural works, pavement construction, roofing, painting, and water-pipeline components.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Make in India (MII): No
- MSE preference: No
Line items (30)
- 2 — Qty: 3 4
- Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all lifts (for all project of NCL). Lead upto 50.00 m — Qty: 2554 Cum
- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil. — Qty: 376 Cum
- Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. — Qty: 407 Cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) — Qty: 50 Cum
- Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3graded stone aggregate 20 mm nominal size de rived from natural sources) — Qty: 227 Cum
- Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). — Qty: 26 Sqm
- Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete — Qty: 95 Sqm
- Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. — Qty: 1351 Sqm
- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level:Cold twisted bars — Qty: 23200 Kg
- Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. — Qty: 172 Cum
- Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. — Qty: 1276 Kg
- Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer- in-charge. The sheet shall be fixed using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. — Qty: 43 Sqm
- Fixing precoated GI profile sheets 0.50 mm total coated thickness ... (only labour rate) using self drilling /self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. Only profile sheet will be provided by department. (Fixing work -labour rate ). — Qty: 75 sqm
- Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work — Qty: 36 sqm
- Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) — Qty: 502 Sqm
- Construction of granular sub-base by providing well graded material like natural sand crushed gravel or crushed stone having CBR >30, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator or plant mix method at OMC, and compacting with vibratory rollers of 80 to 100 kN static weight to achieve the desired density, complete as per Clause 401 of Specification — Qty: 865 Cum
- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density in accordance to Table No. 400-12, 400-13 and as per clause of section 406 of specifications. Laying using Mechanical paver. Deduct from Item No.6.3 & 6.4 above if paver with electronic sensor is not used and laying, compaction is done by any other method (The acceptance criteria regarding level, thickness, surface regularity, texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine laid — Qty: 461 Cum
- Construction of dry lean cement concrete Sub- base over a prepared subgradewith coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1,cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compactingwith 8- 10 tonnes vibratory roller, finishing and curing as per clause 601 of specification complete in all respect. and Deduct above if paver with electronic sensor, vibratory roller are not used and laying, compaction is done by any other method.(The acceptance criteria regarding level, thickness, surface regularity,texture finish, strength of concrete and all other quality control measures shall be the same as in case of machine la — Qty: 188 Cum
- Construction of un-reinforced, dowel jointed, plain cement concrete pavement M-40 grade concrete over a prepared sub base with cement , coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing as per IRC 15 2011 and as per relevant clauses of section 602 of specifications complete but excluding cost of steel in dowel bar and tie rods etc. and Deduct above if paver with electronic sensor is not used and laying, compaction is done by any other method (The acceptance criteria regarding level, thickness, surface r — Qty: 375 Cum
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- imp. Sarvice lane With Nali from Juhi lal colony in Block No 315/4 Block No 317 in ward 84 Zone 3 — Civil Works & Infrastructure · ₹8.3L
- GENERAL REPAIR WORK AT JOINT DIRECTOR SECONDARY EDUCATION OFFICE UDAIPUR — Civil Works & Infrastructure · Rajasthan · ₹15.0L
- 4 NARSAR KARAHIYA SAMPARK MARG SE JUNIOR HIGH SCHOOL TAK PITCH MARG KA LEPAN ANURAKSHAN (SAMANYA MARAMMAT) KARYA.(HOT MIX) — Civil Works & Infrastructure · Uttar Pradesh · ₹15.3L
- Laying RMC M40 in various streets of transport nagar ward no. 30 — Civil Works & Infrastructure · Punjab · ₹1.8Cr
- Estimate For Laying 315mm Dia UPVC U/G Pipe Line For Outlet RD 13350/R of Shahpurkandi Channel No.3 For Year 2026-27 — Civil Works & Infrastructure · Punjab · ₹51.7L
- In Ward-30 Govind Vihar II, work of drain and interlocking tiles from Harendra house to Omendra house and Pravesh house, Sundar house — Civil Works & Infrastructure · ₹19.1L
- purani nagar panchayat ke sthan par shoping complex cum office dukan no 05 — Civil Works & Infrastructure · Madhya Pradesh · ₹8.0L