Maintenance and Upkeep of Port's Water Supply System for a period of one year (2026-2027)
Mormugao Port Authority · Mormugao, Goa · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹45.2L
- EMD: ₹50K
- Published: 12 Oct 2026
- Closing date: 02 Nov 2026
- Status: open
- Status as of: 22 Oct 2026 02:49 UTC
- Department: Engineering (Civil) Department
- Office: Office of the Chief Engineer, MPA Administrative Building, 'SAARASI', Headland Sada
Description
Maintenance and upkeep of Mormugao Port Authority's water supply system for 12 months from the date of issue of the work order or release of site. The work includes water-supply pipeline maintenance and associated civil works. Estimated tender amount is Rs. 45,22,206 excluding GST.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: Yes
- Certifications: Valid MSE certificate issued by MSME authorities, where claiming relaxation, DPIIT certificate, where claiming startup turnover criteria
- Documents required: Proof of tender fee payment or valid MSE exemption certificate, EMD payment proof or valid MSE exemption certificate and bid security declaration, Proof of registered office address in Goa, Statutory registration documents for ESIC, EPF, GST, Income Tax and labour officer, Annual average financial turnover statement/certificate for 2023-24, 2024-25 and 2025-26, Balance sheets and profit and loss account statements signed by a Chartered Accountant with UDIN, Work orders, agreements or letters of award for similar works, Satisfactory completion certificates for similar works, TDS certificates from previous employers or Form 26AS, Duly filled, signed and stamped tender annexures, including Annexures IV, V and VI, Undertaking regarding criminal, fraudulent or anti-competition activity and blacklisting
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Evaluation: Eligibility and responsiveness screening followed by opening of the price bid for shortlisted tenderers
- Make in India (MII): Yes
- MSE preference: Yes
Line items (157)
- Excavation in loose or soft soil including removal of obstructions such as small vegetations, etc., if any. All labour, materials, tools and plants etc., complete. — Qty: 20 Cu. M.
- Excavation in dense or hard soil/murrum, etc. including removal of obstruction, etc., if any. All labour ,materials ,tools and plants etc. complete . — Qty: 20 Cu. M.
- Excavation in hard rock laterite boulders interspersed removal of obstructions etc., if any. All labour ,materials ,tools and plants etc, complete . — Qty: 20 Cu. M.
- Plain Cement concrete (1:2:4) using 20mm graded black trap stone aggregates including mixing, depositing, consolidating, levelling, curing, etc. All labours, materials, tools and plants etc. complete. — Qty: 5 Cu. M.
- Description as detailed in item, no. 4 but for P.C.C (1:3:6). All labour, materials ,tools and plants etc. complete. — Qty: 5 Cu. M.
- Providing and fixing shuttering for columns, beams, side walls etc. of any size and shape including cleaning etc. All labour, materials, tools and plants etc. complete. — Qty: 5 Sq. M.
- Construction masonry using precast cement concrete blocks having a crushing strength of 35kg/cm2 in Cement Mortar (1:6) including curing, etc. All labour, materials ,tools and plants etc. complete. — Qty: 5 Cu. M.
- Providing and fixing to the wall floor etc. GI pipe (class-B) 12/15mmdia including joining, and dismantling of old pipes etc. All labour ,materials, tools and plants etc complete. — Qty: 30 Mtr.
- Providing and fixing in trenches 12/15mmdia GI pipe (class-B), including all fittings and dismantling of old pipes but excluding excavation, etc. All labour, materials ,tools and plants etc. complete — Qty: 30 Mtr.
- P&F to the wall GI pipe 25mm dia (class B) including dismantling of old pipes etc. All labour ,materials ,tools and plants etc. complete. — Qty: 20 Mtr.
- P&F in trenches 25mm dia GI pipe (class B), including all fittings and dismantling of old pipes but excluding excavation etc. All labour ,materials ,tools and plants etc complete. — Qty: 250 Mtr.
- P&F to the wall 40mmdia G.I pipe (class-B),including all fittings and dismantling of old pipes but excluding excavation etc. All labour, materials ,tools and plants etc. complete. — Qty: 30 Mtr.
- P&F in trenches 50mmdia G.I pipe (class-B),including all fittings and dismantling of old pipes but excluding excavation etc. All labour, materials ,tools and plants etc complete. — Qty: 50 Mtr.
- P&L in trenches 80 mm dia G.I pipe (class-B), including all fittings and including dismantling of old pipes but excluding excavation etc. All labour ,materials ,tools and plants etc complete. — Qty: 20 Mtr.
- P&L in trenches, walls etc. 100 mm dia G.I pipe (class B), including all fittings and including dismantling of old pipes but excluding excavation etc. All labour ,materials ,tools and plants etc complete. — Qty: 50 Mtr.
- Providing connection to the existing 20mm PPR pipe with UPVC pipe (15 mm dia) with necessary specials required for joining PPR pipe specials and UPVC pipe specials at the both the ends of repair work , including cutting existing pipe and inserting necessary specials required for PPR pipe (Brass MTA) and UPVC pipe ( Brass FTA) ,necessary instruments /solution required for joining and cutting PPR pipe and UPVC pipe .The cost to include all specials required at both the ends of repair work , necessary breaking the wall and making good the same, necessary scaffolding required for working at above ground level except the cost of UPVC pipe 15mm dia if laid between the repair work which will be paid under item no 25 (per joint represent PPR and UPVC specials required at one end of joint ). All labour, material, tools and plants etc. complete. — Qty: 2 Per joint
- Providing connection to the existing 32mm PPR pipe with UPVC pipe ( 25 mm dia ) with necessary specials required for joining PPR pipe specials and Upvc pipe specials at the both the ends of repair work , including cutting existing pipe and inserting necessary specials required for PPR pipe ( Brass MTA)and UPVC pipe( Brass FTA) ,necessary instruments /solution required for joining and cutting PPR pipe and UPVC pipe .The cost to include all specials required at both the ends of repair work , necessary breaking the wall and making good the same, necessary scaffolding required for working at above ground level except the cost of UPVC pipe 25 mm dia if laid between the repair work which will be paid under item no. 27 (per joint represent PPR and UPVC specials required at one end of joint ). All labour , material , tools and plants etc complete. — Qty: 2 Per joint
- Providing connection to the existing 50mm/63 mm PPR pipe with UPVC pipe ( 40mm/50 mm dia) with necessary specials required for joining PPR pipe specials and UPVC pipe specials at the both the ends of repair work , including cutting existing pipe and inserting necessary specials required for PPR pipe (Brass MTA)and UPVC pipe (UPVC Threaded socket on one side) ,necessary instruments/solution required for joining and cutting PPR pipe and UPVC pipe. The cost to include all specials required at both the ends of repair work , necessary breaking the wall and making good the same , necessary scaffolding required for working at above ground level and necessary tools required for exposing the pipe except the cost of UPVC pipe 50 mm dia , if laid between the repair work which will be paid under item no 29/30 (per joint represent PPR and upvc specials required at one end of joint ) . (cost of excavation will be paid as per item nos. 1,2,3 as the case may be) All labour , material , tools and plant — Qty: 2 Per joint
- P & L in wall, floor, trenches etc , 15mm dia C.P.V.C pipe ( SDR 11) of prince make or equivalent including joining with sockets, bends, Tees , specials ,Reducer specials of required size for connecting existing pipes , , . All cutting threading and joining materials cost pipes and specials , etc. , excluding the cost of excavation but including breaking the wall/ floor /chajja and making good the same .All labour materials, tools , plants etc. complete. — Qty: 10 Mtr.
- P & L in wall, floor trenches etc , 20mm dia C.P.V.C pipe( SDR 11)of prince make or equivalent including joining with sockets, bends, Tees , specials ,Reducer specials of required size for connecting existing pipes. All cutting threading and joining materials cost pipes and specials , etc., excluding cost of excavation but including cost of breaking the wall/ floor /chajja and making good the same .All labour materials, tools , plants etc. complete. — Qty: 5 Mtr.
2 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- imp. Sarvice lane With Nali from Juhi lal colony in Block No 315/4 Block No 317 in ward 84 Zone 3 — Civil Works & Infrastructure · ₹8.3L
- GENERAL REPAIR WORK AT JOINT DIRECTOR SECONDARY EDUCATION OFFICE UDAIPUR — Civil Works & Infrastructure · Rajasthan · ₹15.0L
- 4 NARSAR KARAHIYA SAMPARK MARG SE JUNIOR HIGH SCHOOL TAK PITCH MARG KA LEPAN ANURAKSHAN (SAMANYA MARAMMAT) KARYA.(HOT MIX) — Civil Works & Infrastructure · Uttar Pradesh · ₹15.3L
- Laying RMC M40 in various streets of transport nagar ward no. 30 — Civil Works & Infrastructure · Punjab · ₹1.8Cr
- Estimate For Laying 315mm Dia UPVC U/G Pipe Line For Outlet RD 13350/R of Shahpurkandi Channel No.3 For Year 2026-27 — Civil Works & Infrastructure · Punjab · ₹51.7L
- In Ward-30 Govind Vihar II, work of drain and interlocking tiles from Harendra house to Omendra house and Pravesh house, Sundar house — Civil Works & Infrastructure · ₹19.1L
- purani nagar panchayat ke sthan par shoping complex cum office dukan no 05 — Civil Works & Infrastructure · Madhya Pradesh · ₹8.0L