KMC/EE(C)/Br- XV/135/020/2026-2027/R
Kolkata Municipal Corporation · Kolkata, West Bengal · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹4.9L
- EMD: ₹10K
- Published: 13 Oct 2026
- Closing date: 02 Nov 2026
- Status: open
- Status as of: 22 Oct 2026 03:33 UTC
- Department: Executive Engineer Br-XV
- Office: Executive Engineer (C) Borough-XV, E/3, Circular Garden Reach Road, Kolkata-700024
Description
Repairing the surface drain on the eastern side of Mudialy Road near house numbers P-153, P-145, P-131, P-140/A, etc., in Ward No. 135, Borough XV, Kolkata. Work is to be completed within 90 days from the work order, with commencement within 5 days of receipt. The maintenance period is 12 months.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Documents required: Trade professional license under Section 199/200 of the Kolkata Municipal Act, 1980, or statutory authority documentation, Declaration regarding interest of Municipal Officers or Servants in the tenderer's business, Declaration of relationship or close connection by marriage with the Mayor, Deputy Mayor, Aldermen, Councillors or Corporation officers, Contract labour licence under the Contract Labour (Regulation and Abolition) Act, 1970 and West Bengal Contract Labour (Regulation and Abolition) Rules, 1972, when necessary
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Evaluation: The lowest or any tender is not guaranteed acceptance; fairness of quotation and past conduct of the contractor will be considered
- Make in India (MII): No
- MSE preference: No
Line items (21)
- 29. A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm. as directed and consolidating the same by thorough saturation with water ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity). — Qty: 0.03 %M3
- 6.Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. — Qty: 38.85 SQM
- ORDINARY CEMENT CONCRETE ( MIX 1:2:4 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES — Qty: 2.91 M3
- 33. Brick work with 1st class bricks in cement mortar (1:4) a) In foundation and plinth. — Qty: 11.18 M3
- BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 16. 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. — Qty: 44.71 SQM
- 34. Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface]. i) With 1:4 cement mortar a) 20 mm. thick plaster. — Qty: 106.06 SQM
- 35. Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. NOTE : Cement 0.152 Cum. Per 100 sqm. — Qty: 106.06 SQM
- 31. Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor). (When the height of a particular floor is more than 4 m. the equivalent floor height shall be taken as 4 m. and extra for works beyond the initial 4 m. ht. shall be allowed under 35 f) 25 mm. to 30 mm. shuttering without staging in foundation. — Qty: 43.64 SQM
- ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) — Qty: 6.43 M3
- BUILDING WORKS ( C ) Brickworks,Concrete Works etc.40..Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m.(i) Tor steel/Mild Steel.II. JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL (10th Corrigenda & addenda dated 22.01.2020) — Qty: 0.604365 MT
- (C) III: Labour Rate for Sanitary and Plumbing 4.Methor Mazdoor NOTE:The above rates are exclusive of 10 % profit and 1% Labour welfare cess, which would be admissible to the Contractor, but contractual percentage will not be applicable on the above rates.Page 113 of 124 — Qty: 240 EA
- (23)Supplying, fitting and fixing in positing reinforced cement polymer concrete manhole /gully pit cover with matching frame as per I.S. 12592 (m.D.) ii) 25 mT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover : 680 mm. X 90 mm. Frame : 800 mm. X 165 mm. Opening : 500 mm. Weight : 196 Kg. (approx.) — Qty: 8 EA
- (23)Supplying, fitting and fixing in positing reinforced cement polymer concrete manhole /gully pit cover with matching frame as per I.S. 12592 (m.D.)xi) 10 mT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover : 560 mm. X 405 mm. X 85 mm. Frame : 710 mm. X 566 mm. X 165 mm. Weight : 132 Kg. (approx.) — Qty: 4 EA
- SUPPLYING, INSTALLING & OPERATING PUMPING SETS INCLUDING FUEL,OIL,STORE, STAFF, TEMPORARY SHED ETC. & ACCESSORIES COMPLETE. — Qty: 400 HR
- BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. — Qty: 6.94 M3
- BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof. — Qty: 2.29 M3
- 30. Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound in conformity with the municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer-in-Charge. — Qty: 24.21 M3
- 2.Hire charge of pneumatic concrete chiseler with all attachment per day of 8 hrs. or part of 8 hrs. — Qty: 4 DAY
- Add: 9%SGST — Qty: 1 LS
- Add: 9%CGST — Qty: 1 LS
3 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- imp. Sarvice lane With Nali from Juhi lal colony in Block No 315/4 Block No 317 in ward 84 Zone 3 — Civil Works & Infrastructure · ₹8.3L
- GENERAL REPAIR WORK AT JOINT DIRECTOR SECONDARY EDUCATION OFFICE UDAIPUR — Civil Works & Infrastructure · Rajasthan · ₹15.0L
- 4 NARSAR KARAHIYA SAMPARK MARG SE JUNIOR HIGH SCHOOL TAK PITCH MARG KA LEPAN ANURAKSHAN (SAMANYA MARAMMAT) KARYA.(HOT MIX) — Civil Works & Infrastructure · Uttar Pradesh · ₹15.3L
- Laying RMC M40 in various streets of transport nagar ward no. 30 — Civil Works & Infrastructure · Punjab · ₹1.8Cr
- Estimate For Laying 315mm Dia UPVC U/G Pipe Line For Outlet RD 13350/R of Shahpurkandi Channel No.3 For Year 2026-27 — Civil Works & Infrastructure · Punjab · ₹51.7L
- In Ward-30 Govind Vihar II, work of drain and interlocking tiles from Harendra house to Omendra house and Pravesh house, Sundar house — Civil Works & Infrastructure · ₹19.1L
- purani nagar panchayat ke sthan par shoping complex cum office dukan no 05 — Civil Works & Infrastructure · Madhya Pradesh · ₹8.0L