Improvement of SC ST Baties in NCT of Delhi
Irrigation and Flood Control · Hastal, Delhi · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹4.3Cr
- EMD: ₹8.7L
- Published: 28 Oct 2026
- Closing date: 12 Nov 2026
- Status: open
- Status as of: 02 Nov 2026 03:55 UTC
- Department: Irrigation and Flood Control Department
- Office: Civil Division-XI
Description
Demolishing and reconstruction of a two-storey Balmiki Chaupal at SC/ST Basties in Village Hastal, Vikas Puri AC-31, District West Delhi. Estimated value is Rs. 43,474,063 and EMD is Rs. 869,481.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Make in India (MII): No
- MSE preference: No
Line items (121)
- Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil. — Qty: 139 Cubic Metre
- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. All Kinds of soil. — Qty: 319 Cubic Metre
- Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including letting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m - All kinds of soil - Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia — Qty: 81 Metre
- Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc, in layers not exceeding 20cm. in depth; consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m — Qty: 458 Cubic Metre
- Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials - All kinds of soil — Qty: 87 Cubic Metre
- Supplying an filling in plinth with Jamuna sand under floors including watering, ramming, consolidating and dressing complete — Qty: 59 Cubic Metre
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) . — Qty: 148 Cubic Metre
- Centering and shuttering including strutting, propping etc. and removal of form for -Foundations, footings, bases of columns etc. for mass concrete. — Qty: 294 Square Metre
- Centering and shuttering including strutting, propping etc. and removal of form for -Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. — Qty: 13 Square Metre
- Centering and shuttering including strutting, propping etc. and removal of form for -Suspended floors, roofs, landing, balconies and access platform. — Qty: 784 Square Metre
- Centering and shuttering including strutting, propping etc. and removal of form for -Lintels, beams, plinth beams, girders, brussumers and cantilevers. — Qty: 792 Square Metre
- Centering and shuttering including strutting, propping etc. and removal of form for -Columns, pillars, pier, abutments, posts and struts. — Qty: 465 Square Metre
- Centering and shuttering including strutting, propping etc. and removal of form for -Stairs (excluding landings) except spiral staircases — Qty: 29 Square Metre
- Centering and shuttering including strutting, propping etc. and removal of form for -Weather shed, Chajjas, corbels etc., including edges — Qty: 18 Square Metre
- Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level or above plinth level. Thermo-Mechanically Treated bars. — Qty: 51457 Kilogram
- Providing and laying in position ready mixed or site batched design mixcement concrete for reinforced cement concrete work; using coarseaggregate and fine aggregate derived from natural sources, PortlandPozzolana / Ordinary Portland /Portland Slag cement, admixtures inrecommended proportions as per IS: 9103 to accelerate / retard settingof concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete - Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement - All works upto plinth level - — Qty: 174 Cubic Metre
- Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarseaggregate and fine aggregate derived from natural sources, PortlandPozzolana / Ordinary Portland /Portland Slag cement, admixtures inrecommended proportions as per IS: 9103 to accelerate / retard settingof concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete - Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement - All works above plinth level — Qty: 263 Cubic Metre
- Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand). — Qty: 57 Cubic Metre
- Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in - Cement mortar 1:6 (1 cement : 6 coarse sand) — Qty: 187 Cubic Metre
- Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. Cement Mortar 1:4 (1 cement : 4 coarse sand). — Qty: 12 Square Metre
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Construction of Mali Hut at Bimalnag Nursery under CAMPA CAT RATTLE for the year 2026 27 — Civil Works & Infrastructure · Jammu and Kashmir · ₹16.7L
- CONSTRUCTION OF TOILET BLOCK IN SANOUR CITY — Civil Works & Infrastructure · Punjab · ₹9.1L
- Construction of Segregation Shed and Community Compost Pit at K.N.Savulur H/O K.Naduhalli — Civil Works & Infrastructure · Tamil Nadu · ₹4.0L
- Repair of street and drainage in w.no.2 — Civil Works & Infrastructure · Punjab · ₹25.0L
- Repair and renovation of University Library Building at GADVASU, Ludhiana. — Civil Works & Infrastructure · Punjab · ₹9.5L
- P/F Interlocking Tiles St. Baba Jora EO Gurudwara Street Ward No.07 — Civil Works & Infrastructure · Punjab · ₹3.4L