Ground Mounted Solar Power Plant 750 KWP with SCADA and Net Metering System
Indian Army · Power Generation & Renewable Energy · open
Key facts
- Published: 22 Aug 2026
- Closing date: 01 Sep 2026
- Status: open
- Ministry: Ministry Of Defence
- Department: Department Of Military Affairs
Description
Design, supply, installation, and commissioning of a ground-mounted solar power plant of 750 KWP capacity, including SCADA and net metering system, for the Indian Army under the Ministry of Defence.
Eligibility & requirements
- Experience required: 3 years
- Startup relaxation: Yes
- MSE relaxation: Yes
- Documents required: Bidder Experience Certificate, Turnover Certificate, OEM Annual Turnover Certificate
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Make in India (MII): No
- MSE preference: No
Line items (1)
- Ground Mounted Solar Power Plant 750 KWP with SCADA and Net Metering System — Qty: 1 KWP
1 tender document(s) available — sign up to download.
Related tenders
- Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) — Power Generation & Renewable Energy · ₹19.0L
- Solar Power Plant (Roof Top) for ONGRID System, Three Phase (V2) — Power Generation & Renewable Energy · Uttar Pradesh · ₹58.0L
- Diesel Power Generator (V2) — Power Generation & Renewable Energy · Bihar · ₹25.0L
- Diesel Power Generator (V2) — Power Generation & Renewable Energy · Delhi · ₹9.5L
- Diesel Power Generator (V2) — Power Generation & Renewable Energy · Chandigarh · ₹20.0L
- Diesel Power Generator (V2) — Power Generation & Renewable Energy · Uttar Pradesh
- Roof Top Solar Work including Civil and Electrical Works — Power Generation & Renewable Energy
- Diesel Power Generator (V2) — Power Generation & Renewable Energy · Uttar Pradesh · ₹14.8L