Drivage of 1 No. Underground Vertical Air Shaft from Seam-III to Seam-I to establish return airway system for Vijay West UG Mine at Rani Atari Sub Area
South Eastern Coalfields Limited · Chirimiri, Chhattisgarh · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹2.2Cr
- EMD: ₹2.8L
- Published: 12 Oct 2026
- Closing date: 28 Oct 2026
- Status: open
- Status as of: 18 Oct 2026 23:00 UTC
- Office: Chirimiri Area
Description
Drivage of one underground vertical air shaft from Seam-III to Seam-I to establish a return airway system for Vijay West UG Mine at Rani Atari Sub Area. Estimated value is INR 22,162,010; the BOQ total is INR 18,781,364.43.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Evaluation: L1 bidder based on Cost to Company (CTC)
- Make in India (MII): No
- MSE preference: No
Line items (38)
- 2 — Qty: 3 4
- Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Hard rock (requiring blasting) — Qty: 1040.48 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 38.3m to 39m — Qty: 21.94835 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 39m to 40.5m — Qty: 39.58397 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 40.5m to 42m — Qty: 37.721919 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 42m to 43.5m — Qty: 38.9632866 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 43.5m to 45m — Qty: 42.6873894 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 45m to 46.5m — Qty: 37.721919 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 46.5m to 48m — Qty: 37.721919 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 48m to 49.5m — Qty: 43.928757 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 49.5m to 51m — Qty: 37.721919 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 51m to 52.5m — Qty: 37.721919 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 52.5m to 54m — Qty: 30.46543552 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 54m to 55.5m — Qty: 39.5839704 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 55.5m to 57m — Qty: 37.721919 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 57m to 58.5m — Qty: 38.9632866 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 58.5m to 60m — Qty: 42.6873894 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 60m to 61.5m — Qty: 37.721919 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 61.5m to 63m — Qty: 37.721919 cum
- Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. Ordinary or hard rock 63m to 64.5m — Qty: 43.928757 cum
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- imp. Sarvice lane With Nali from Juhi lal colony in Block No 315/4 Block No 317 in ward 84 Zone 3 — Civil Works & Infrastructure · ₹8.3L
- GENERAL REPAIR WORK AT JOINT DIRECTOR SECONDARY EDUCATION OFFICE UDAIPUR — Civil Works & Infrastructure · Rajasthan · ₹15.0L
- 4 NARSAR KARAHIYA SAMPARK MARG SE JUNIOR HIGH SCHOOL TAK PITCH MARG KA LEPAN ANURAKSHAN (SAMANYA MARAMMAT) KARYA.(HOT MIX) — Civil Works & Infrastructure · Uttar Pradesh · ₹15.3L
- Laying RMC M40 in various streets of transport nagar ward no. 30 — Civil Works & Infrastructure · Punjab · ₹1.8Cr
- Estimate For Laying 315mm Dia UPVC U/G Pipe Line For Outlet RD 13350/R of Shahpurkandi Channel No.3 For Year 2026-27 — Civil Works & Infrastructure · Punjab · ₹51.7L
- In Ward-30 Govind Vihar II, work of drain and interlocking tiles from Harendra house to Omendra house and Pravesh house, Sundar house — Civil Works & Infrastructure · ₹19.1L
- purani nagar panchayat ke sthan par shoping complex cum office dukan no 05 — Civil Works & Infrastructure · Madhya Pradesh · ₹8.0L