Construction of Science Lab and CWSN Toilet at Prahallad Sardar Para High School under Karbook Block of Gomati District under PM SHRI Scheme for the year 2023-24/3rd Call
Samagra Shiksha Abhiyan · Karbook, Tripura · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹26.0L
- EMD: ₹52K
- Published: 29 Oct 2026
- Closing date: 12 Nov 2026
- Status: open
- Status as of: 01 Nov 2026 14:25 UTC
- Department: School Education Department
- Office: Engineering Cell, Samagra Shiksha, Old Shishu Bihar School Complex, Agartala
Description
Construction of a science laboratory and CWSN toilet at Prahallad Sardar Para High School, Karbook Block, Gomati District, under the PM SHRI Scheme. Estimated cost is Rs. 26,04,300; completion period is 6 months.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Documents required: Firm registration documents, Civil bidder registration, Partnership deed or Articles of Association, Professional Tax clearance certificate, Sales Tax clearance certificate, Valid Labour Department license for engagement of workers, Downloaded DNIT as proof of acceptance of terms and conditions, Statement-I: availability of critical equipment, Statement-II: availability of key personnel, Statement-III: litigation history, Statement-IV: quality control testing laboratory details or tie-up, Bidder declaration as per Annexure-II, Undertaking as per Annexure-III, Bank solvency certificate as per Annexure-IV, Performance Bank Guarantee as per Annexure-V, Schedule-A as per Annexure-VI, Corrigendum, if any, PAN Card
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Single Bid
- Evaluation: Percentage rate
- Make in India (MII): No
- MSE preference: No
Line items (56)
- Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil — Qty: 76.178 Cum
- Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. -All kinds of soil — Qty: 15.499 cum
- Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil — Qty: 102.287 Cum
- Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete — Qty: 17.195 Cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size) — Qty: 13.354 Cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded stoneaggregate 20 mm nominal size) — Qty: 1.878 cum
- Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work upto plinth level: 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) — Qty: 22.512 Cum
- Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level. 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) — Qty: 3.204 cum
- Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) — Qty: 4.56 Cum
- Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size). — Qty: 0.55 cum
- Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size). — Qty: 18.748 Cum
- Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five levelexcluding the cost of centring, shuttering, finishing and reinforcement- 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) — Qty: 2.149 cum
- Centering shuttering including struttings, propping etc.and removal of form work for: a) Foundations, footings, bases for columns etc. for mass concrete with timber plank. — Qty: 23.14 Sqm
- b) Columns, Pillars, Piers, Abutments, Posts and Struts with shuttering ply — Qty: 56.8 Sqm
- Centering shuttering including struttings, propping etc. and removal of form work for: Columns, Pillars, Piers, Abutments, Posts and Struts with wooden plank — Qty: 10.6 sqm
- c) Lintels, beams, plinth beams, girders, bressumers and cantilevers with shuttering ply — Qty: 116.587 Sqm
- Centering shuttering including struttings, propping etc. and removal of form work for: Lintels, beams, plinth beams, girders, bressumers and cantilevers with wooden plank — Qty: 18.558 sqm
- d) Suspended floors, roofs, landings, balconies and access platform with 12 mm thicshuttering ply — Qty: 89.64 Sqm
- Centering shuttering including struttings, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platform with timber planks — Qty: 14.208 sqm
- f) Weather shade, chajjas, corbels etc. including edges — Qty: 5.603 Sqm
3 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Construction of Mali Hut at Bimalnag Nursery under CAMPA CAT RATTLE for the year 2026 27 — Civil Works & Infrastructure · Jammu and Kashmir · ₹16.7L
- CONSTRUCTION OF TOILET BLOCK IN SANOUR CITY — Civil Works & Infrastructure · Punjab · ₹9.1L
- Construction of Segregation Shed and Community Compost Pit at K.N.Savulur H/O K.Naduhalli — Civil Works & Infrastructure · Tamil Nadu · ₹4.0L
- Repair of street and drainage in w.no.2 — Civil Works & Infrastructure · Punjab · ₹25.0L
- Repair and renovation of University Library Building at GADVASU, Ludhiana. — Civil Works & Infrastructure · Punjab · ₹9.5L
- P/F Interlocking Tiles St. Baba Jora EO Gurudwara Street Ward No.07 — Civil Works & Infrastructure · Punjab · ₹3.4L