Construction of Remaining Balance work of 02 Lane ROB at LC No. 02 on Ajmer-Daurai Section on DFC Route at Ajmer (Excluding cost of Cement)
Rajasthan State Road Development & Construction Corporation Ltd. (RSRDC) · Ajmer, Rajasthan · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹11.5Cr
- EMD: ₹23.0L
- Published: 27 Oct 2026
- Closing date: 16 Nov 2026
- Status: open
- Status as of: 01 Nov 2026 13:43 UTC
- Office: Project Director, RSRDC Ltd., Unit-Ajmer
Description
Construction of the remaining balance work for a two-lane road over bridge at level crossing No. 02 on the Ajmer-Daurai section of the DFC route at Ajmer, excluding the cost of cement. The estimated value is INR 114,779,000 and the EMD is INR 2,295,580.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Documents required: Documents defining constitution or legal status, place of registration, and principal place of business, Power of attorney of the bid signatory, Construction work monetary value for each of the last five years, Similar-work experience and details of works underway or contractually committed, including client references, Details of major construction equipment proposed, Qualifications and experience of proposed key site management and technical personnel, Profit and loss statements and auditor's reports for the past five years, Bank-certified evidence of access to lines of credit and other financial resources, not more than three months old, Authority to seek references from the bidder's bankers, Information regarding current or past-five-year litigation, Subcontracting proposals for components exceeding 10 per cent of the bid price, with subcontractor qualifications and experience, Joint venture agreement or letter of intent and proposed agreement, if bidding as a joint venture
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Make in India (MII): No
- MSE preference: No
Line items (108)
- Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. — Qty: 0.0001 Cum
- (a) in ordinary rock: Depth upto 1.5 m — Qty: 47.95 Cum
- carriage of Material by mechanical transport i/c loading, unloading and stacking for 10 KM — Qty: 47.95 Cum
- Providing, laying and compacting plain/ reinforced cement concrete of specified grade in foundation/ leveling course/pilecap usingconcrete mixer and vibrater complete including cost of form work, as per drawing and technical specifications and as per clause 1100,1500,1700,2100 of MoRT&H specification including all scaffolding material, labour, machinery. : PCC Grade M -15 (Excluding cost of cement) — Qty: 133.5315 Cum
- Providing, laying and compacting design mix plain/ reinforced cement concrete of specified grade in foundation/ levelingcourse/pile cap using batching plant, transit mixer and concrete pump and vibrater including cost of form work, complete as per drawing and technical specifications as per clause 1100, 1500,1700,2100 of RT&H specification including all material, labour, machinery, : R.C.C. grade M35 Design mix concrete (Excluding cost of cement) — Qty: 311.75 Cum
- Providing and laying TMT bar reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery.: HYSD bar reinforcement — Qty: 0.0001 Cum
- SUB STRUCTURE — Qty: 0.0001 Cum
- Providing and laying structural plain/ reinforced cement concrete (design mix) of specified grade in substructure at all levels using batching plant, transit mixer, concrete pump and vibrater cluding cost of form work complete as per drawing and clause 1500, 1700 and 2200 of MoRT&H specification including all scaffolding, material, labour, machinery etc.: RCC Grade M -35 (Excluding cost of cement) — Qty: 49.8176 Cum
- Providing and laying TMT bar reinforcement at any level infoundation/ pile/ pile cap complete as per drawing and clause 1600of MoRT&H Specification including all material, labour and machinery.: HYSD Bar Reinforcement — Qty: 9.96352 MT
- Supplying, fitting and fixing in position true to line and level POTPTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRT&H Specifications complete as per drawing and approved technical specifications and as per clause 2000 & 2200 of MoRT&H Specification including all scaffolding, material, labour, machinery etc. — Qty: 4600 per tonn load
- SUPER STRUCTURE — Qty: 0.0001 Cum
- Providing, precasting, transportation and placing in position at all level precast pre/post-tensioned specified grade girders as per drawing and clause 1800 & 2300 of MoRT&H specifications (excluding cost of reinforcement, HTS strands and pre-stressing) including all material, labour, machinery (suitable crane).: RCC M-45 (Excluding cost of cement) — Qty: 532.896 Cum
- Providing and laying High tensile steel wires/ strands at any level including all accessories for stressing, stressing operations and grouting complete as per drawing, technical specification and as per clause 1800 of MoRT&H Specification.: Cable 19 k 13 (stand) — Qty: 18 tonne
- Providing and laying TMT bar reinforcement at any level infoundation/ pile/ pile cap complete as per drawing and clause 1600of MoRT&H Specification including all material, labour and machinery.: HYSD Bar Reinforcement — Qty: 106.5792 Tonne
- Load testing of one or more spans of bridge as selected by the Engineer as per approved load test procedure following relevant IS/IRC/Railway codes with contractor’s labour, deflection measuring instruments, loading materials, recoding and analyzing the load testing results including all lead & lift, etc. complete as required. The rates are all inclusive and will be paid after load test is finished and girder is cleared of the kentledges /loading material etc. The load shall be 1.25 times the stipulated design load Based on Design load & not span (Load = 200 T): For span design load upto 100 MT — Qty: 4 PER TEST
- Extra for increase of 100 MT or part thereof in the span load capacity upto 800 MT — Qty: 8 Per 100 T per test
- Fabrication, Welding, Riveting, olting by HSFG bolts wherever required, supply, transportation to site, Assembling, Launching, Erecting of steel girder spans as per drawings and specifications approved by Railway and department for composite construction i.e. (Steel +RCC) of superstructure of the Road Over Bridge with ontractor’s own mild steel confirming to IS: 2062 Grade 250(B) with all welds, rivets, nuts bolts rivet materials, weld materials, HSFG bolts, service bolts, with other ancillary steel structures fixed to the girder where necessary in proper level and alignment and as per technical specifications etc. with contractor’s own materials, fabrication, machinery, templates, fixtures, equipments tools and plants, transportation to site, skilled/ unskilled labour, excise duty., Octroi, sales tax and other taxes, all leads and lifts, descent, loading, unloading, crossing one or more Railway track if required etc. complete and as per technical specifications. The rate shall also be — Qty: 0.0001 Cum
- (A) Complete Item — Qty: 305 mt
- Providing and constructing of Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with specified grade concrete using batching plant, transit mixer, concrete pump and vibrator with 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design and dimensions in the approved drawing and at locations directed by the Engineer, all as specified as per clause 809 of MoRT&H specification including all material, labour scaffolding etc.: RCC M-35 (Excluding cost of cement) — Qty: 200 Cum
- Providing and fixing Mild steel railing including painted, complete as per drawing and technical specification and as per clause 1900 & 2703.2 of MoRT&H Specification including all material, labour, machinary etc. — Qty: 100 Mtr
5 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Macdamization of road surface at syed Kamalud din Colony wanganpora Eid gah Near UPHC from h/o Ali Mohd upto h/o Nasir Khalel. — Civil Works & Infrastructure · Jammu and Kashmir · ₹15.0L
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Construction of Mali Hut at Bimalnag Nursery under CAMPA CAT RATTLE for the year 2026 27 — Civil Works & Infrastructure · Jammu and Kashmir · ₹16.7L
- CONSTRUCTION OF TOILET BLOCK IN SANOUR CITY — Civil Works & Infrastructure · Punjab · ₹9.1L
- Repair of street and drainage in w.no.2 — Civil Works & Infrastructure · Punjab · ₹25.0L
- Repair and renovation of University Library Building at GADVASU, Ludhiana. — Civil Works & Infrastructure · Punjab · ₹9.5L
- P/F Interlocking Tiles St. Baba Jora EO Gurudwara Street Ward No.07 — Civil Works & Infrastructure · Punjab · ₹3.4L