Construction of RCC Flooring in 2nd XDW Drift for CM Marching Route in Depillaring Panal
South Eastern Coalfields Limited · Vindhya Underground Mine, Madhya Pradesh · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹16.4L
- EMD: ₹21K
- Published: 27 Oct 2026
- Closing date: 09 Nov 2026
- Status: open
- Status as of: 28 Oct 2026 06:55 UTC
- Office: Johilla Area
Description
Construction of RCC flooring in the 2nd XDW Drift for the CM marching route in Depillaring Panel CM-4A and CM-4B to CM-5 Panel at Vindhya Underground Mine, Johilla Area. The work includes debris removal, material carriage, reinforcement, shuttering, concrete laying, and supply of materials.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Evaluation: Cost to Company (CTC) for deciding L1 bidder
- Make in India (MII): No
- MSE preference: No
Line items (13)
- 2 — Qty: 3 4
- Cleaning/removal of debris /stone from UG galleries and stacking within 50 Mtr. Distance. — Qty: 87.75 Per Cum.
- Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Sand : — Qty: 53.46 Per Cum.
- Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Stone aggregate below 40mm nominal size : — Qty: 106.92 Per Cum.
- Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Cement : — Qty: 778 Per Bag (50 Kg)
- Carriage of materials by maual labour including loading, unloading and stacking for lead less than 0.50 Km. (Cost for Ist 50 Mtr.) For Steel : — Qty: 1088 Per Kg.
- Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars — Qty: 1088 Kg.
- Centring and shuttering including strutting, propping etc. and removal of form for : walls (any thickness) including attached plisters, buttresses, plinth and string courses etc. — Qty: 70.2 Sqm.
- Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforecement- all work upto plinth level : 1:2:4 (1 Cement : 2 Coarse sand : 4 Graded stone aggregate 20 mm nominal size) — Qty: 121.5 Cum.
- Material rate : For Sand — Qty: 53.46 Cum.
- Material rate : For Metal/stone chips — Qty: 106.92 Cum.
- Material rate : For Cement : (50 Kg./Bag) — Qty: 778 Bag
- Material rate : For Twisted Steel bars — Qty: 1088 Kg.
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Macdamization of road surface at syed Kamalud din Colony wanganpora Eid gah Near UPHC from h/o Ali Mohd upto h/o Nasir Khalel. — Civil Works & Infrastructure · Jammu and Kashmir · ₹15.0L
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Construction of Mali Hut at Bimalnag Nursery under CAMPA CAT RATTLE for the year 2026 27 — Civil Works & Infrastructure · Jammu and Kashmir · ₹16.7L
- CONSTRUCTION OF TOILET BLOCK IN SANOUR CITY — Civil Works & Infrastructure · Punjab · ₹9.1L
- Repair of street and drainage in w.no.2 — Civil Works & Infrastructure · Punjab · ₹25.0L
- Repair and renovation of University Library Building at GADVASU, Ludhiana. — Civil Works & Infrastructure · Punjab · ₹9.5L
- P/F Interlocking Tiles St. Baba Jora EO Gurudwara Street Ward No.07 — Civil Works & Infrastructure · Punjab · ₹3.4L