Construction of Proposed Model Zila Parishad Office Building Simdega Jharkhand
Simdega Zila Parishad · Simdega, Jharkhand · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹8.0Cr
- EMD: ₹16.1L
- Published: 23 Oct 2026
- Closing date: 19 Nov 2026
- Status: open
- Status as of: 06 Nov 2026 03:50 UTC
- Department: District Board, Simdega
- Office: Zila Parishad Office, Simdega
Description
Construction of the proposed Model Zila Parishad Office Building in Simdega, Jharkhand. The estimated cost is Rs. 8,01,13,200, the completion period is 24 months, and the bid security is Rs. 16,05,000.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Documents required: Electronic receipt of tender cost, Earnest money deposit receipt (Bid Security), Credit facility, GST, PAN, Five years audited turnover, Character certificate, Work experience, Partnership deed or Articles of Association / Memorandum, Undertakings, Affidavits, E.P.F., Index table of required bid documents with page numbers
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Item Rate
- Evaluation: Item rate
- Make in India (MII): No
- MSE preference: No
Line items (337)
- EARTH WORK IN EXCAVATION IN FOUNDATION Trenches in ordinary soil (vide classification of soil item -A) and disposal of excavated earth as obtained to a distance upto 50 M including all lift, leveling ramming the foundation trenches, removing roots of tree shrubs all complete as per approved design, building specification and direction of E/I 5.1.1 J.S.R. — Qty: 348.09 Cum
- EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) 5.1.7 JSR — Qty: 207.84 Cum
- EARTH FILLING IN FOUNDATION TRENCHES AND PLINTH in layers not exceeding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) — Qty: 310.17 Cum
- Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume) — Qty: 89.49 Cum
- Providing designation 75-A, BRICK FLAT SOLING joints filled with local sand including cost of watering,taxes and royalty all complete as per building specification and direction of Engineer Incharge. 5.6.1 JSR — Qty: 712.05 Sqm
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto pinth level : 1:2:4(1 cement : 2 coarse sand (Zone III) : 4 graded stone aggregate 20 mm nominal size) — Qty: 16.39 Cum
- Centering and shuttering including strutting, propping, etc. and removal of form for Foundations, footings, bases of columns, etc. mass concrete — Qty: 29.99 Sqm
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto pinth level : 1:2:4(1 cement : 2 coarse sand (Zone III) : 4 graded stone aggregate 20 mm nominal size) — Qty: 76.41 Cum
- Providing and laying in position specified grade of reinforced cement concrete, exluding the cost of centring, shuttering, finishing and reinforcement: all work upto plinth work 1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size) — Qty: 86.19 Cum
- Centering and shuttering including strutting, propping, etc. and removal of form for Foundations, footings, bases of columns, etc. mass concrete — Qty: 280.54 Sqm
- Reinforced cement concrete work in wall (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts, and struts etc. above plinth level upto floor five floor, exluding the cost of centring, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size) — Qty: 78.84 Cum
- Centering and shuttering including strutting, propping, etc. and removal of form for Foundations, footings, bases of columns, etc. mass concrete — Qty: 810.5 Sqm
- Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15◦ landings, balcony, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral staircases, above plinth level upto floor five level, exluding the cost of centring, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size) — Qty: 197.4 Cum
- Centering and shuttering including strutting, propping, etc. and removal of form for Suspended floors, roofs, landings, balconies, and access, platform — Qty: 1558.9 Sqm
- Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15◦ landings, balcony, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral staircases, above plinth level upto floor five level, exluding the cost of centring, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size) — Qty: 35.74 Cum
- Centering and shuttering including strutting, propping, etc. and removal of form for Suspended floors, roofs, landings, balconies, and access, platform — Qty: 573.62 Sqm
- Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15◦ landings, balcony, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral staircases, above plinth level upto floor five level, exluding the cost of centring, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size) 5.3.11JSR — Qty: 289.07 Cum
- Centering and shuttering including strutting, propping, etc. and removal of form for Suspended floors, roofs, landings, balconies, and access, platform — Qty: 1901.3 Sqm
- Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15◦ landings, balcony, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral staircases, above plinth level upto floor five level, exluding the cost of centring, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size) — Qty: 22.3 Cum
- Centering and shuttering including strutting, propping, etc. and removal of form for Suspended floors, roofs, landings, balconies, and access, platform — Qty: 174.46 Sqm
2 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Construction of Mali Hut at Bimalnag Nursery under CAMPA CAT RATTLE for the year 2026 27 — Civil Works & Infrastructure · Jammu and Kashmir · ₹16.7L
- CONSTRUCTION OF TOILET BLOCK IN SANOUR CITY — Civil Works & Infrastructure · Punjab · ₹9.1L
- Construction of Segregation Shed and Community Compost Pit at K.N.Savulur H/O K.Naduhalli — Civil Works & Infrastructure · Tamil Nadu · ₹4.0L
- Repair of street and drainage in w.no.2 — Civil Works & Infrastructure · Punjab · ₹25.0L
- Repair and renovation of University Library Building at GADVASU, Ludhiana. — Civil Works & Infrastructure · Punjab · ₹9.5L
- P/F Interlocking Tiles St. Baba Jora EO Gurudwara Street Ward No.07 — Civil Works & Infrastructure · Punjab · ₹3.4L