Construction of Police Station Ladwa District Kurukeshtra
Haryana Police Housing Corporation · Ladwa, Haryana · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹5.6Cr
- EMD: ₹11.1L
- Published: 28 Oct 2026
- Closing date: 12 Nov 2026
- Status: open
- Status as of: 04 Nov 2026 06:05 UTC
- Department: Haryana Police
Description
Construction of the proposed Police Station at Ladwa, District Kurukshetra, including civil, structural, finishing and associated works. The estimated value is Rs. 5,55,77,402 and the EMD is Rs. 11,12,000.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Make in India (MII): No
- MSE preference: No
Line items (389)
- HSR Item 6.33.6-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more HSR Rate(Rs.) 66.00 Through Rate — Qty: 141808.7 Kg.
- HSR Item 4.32-Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. HSR Rate(Rs.) 46.00 Through Rate — Qty: 493.449 cum
- HSR Item 6.30.5-Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers HSR Rate(Rs.) 296.00 Through Rate — Qty: 3914.656 Sqm
- HSR Item 13.10.1-Providing and fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 1. 4.0 mm thick glass panes HSR Rate(Rs.) 539.00 Through Rate — Qty: 144.539 Sqm
- HSR Item 6.1.6-Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) HSR Rate(Rs.) 2442.00 Through Rate — Qty: 150.772 cum
- HSR Item 11.77-Applying pink primer or aluminium priming coat on wood work including preparation of surface, Knotting and stopping etc. HSR Rate(Rs.) 19.00 Through Rate — Qty: 858.571 Sqm
- HSR Item 9.58.5.2-Providing and fixing on wall face Unplasticised - PVC moulded fittings/ accessories for Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion. 5.2. Bend 87.5° 110 mm bend HSR Rate(Rs.) 93.00 Through Rate — Qty: 8 Each
- HSR Item 12.37.1-Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters: 1. 35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws HSR Rate(Rs.) 1400.00 Through Rate — Qty: 164.458 Sqm
- HSR Item 6.25.2-Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. 2. All works above plinth level up to floor IV level HSR Rate(Rs.) 4502.00 Through Rate — Qty: 829.922 cum
- HSR Item 10.47-Providing and laying Baroda Green marble stone 17mm and above thick in risers of step, skirting , dado, pillars and wall lining included matching the grains of marble slab in any pattern as specified laid over 12mm thick cement sand mortar 1:3 and jointed with white cement slurry mixed with pigment to match the shade of marble including rubbing and polishing. The rates are for all heights / storey. The sample shall be got approved from Engineer In Charge. HSR Rate(Rs.) 1214.00 Through Rate — Qty: 205.542 Sqm
- HSR Item 13.41-Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories and stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). HSR Rate(Rs.) 396.00 Through Rate — Qty: 440 Kg.
- HSR Item 12.87.2-Providing and fixing magnetic catcher of approved quality in cupboard / ward robe shutters, including fixing with necessary screws etc. complete. 2. Double strip (horizontal type) HSR Rate(Rs.) 23.00 Through Rate — Qty: 40 Each
- HSR Item 6.30.3-Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform HSR Rate(Rs.) 208.00 Through Rate — Qty: 2102.512 Sqm
- HSR Item 8.27.2-Providing edge moulding to 18 mm thick marble stone counters, Vanities etc., including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-Charge. 2. Granite work HSR Rate(Rs.) 230.00 Through Rate — Qty: 414.49 Metre
- HSR Item 8.26.2.2-Providing and fixing 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. 2.2. Granite of any colour and shade Area of slab over 0.50 sqm HSR Rate(Rs.) 2776.00 Through Rate — Qty: 150.299 Sqm
- HSR Item 12.33.2-Providing and fixing fly proof stainless steel grade 304 wire gauge, to windows and clerestory windows using wire gauge with average width of aperture 1.4 mm in both directions with wire of dia. 0.50 mm all complete. 2. With 12 mm mild steel U beading HSR Rate(Rs.) 697.00 Through Rate — Qty: 91.602 Sqm
- HSR Item 8.29-Mirror polishing on marble work/Granite work/stone work where ever required to give high gloss finish complete. HSR Rate(Rs.) 209.00 Through Rate — Qty: 581.537 Sqm
- HSR Item 11.78-Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. HSR Rate(Rs.) 31.00 Through Rate — Qty: 1579.672 Sqm
- HSR Item 12.15-Extra for providing frosted glass panes 4 mm thick instead of ordinary float glass panes 4 mm thick in doors, windows and clerestory window shutters. (Area of opening for glass panes excluding portion inside rebate shall be measured). HSR Rate(Rs.) 186.00 Through Rate — Qty: 27.916 Sqm
- HSR Item 28.16-Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken up to 30 cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately). For the purpose of measurement the entire treated surface will be measured. HSR Rate( — Qty: 745.176 Sqm
2 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Construction of Mali Hut at Bimalnag Nursery under CAMPA CAT RATTLE for the year 2026 27 — Civil Works & Infrastructure · Jammu and Kashmir · ₹16.7L
- CONSTRUCTION OF TOILET BLOCK IN SANOUR CITY — Civil Works & Infrastructure · Punjab · ₹9.1L
- Construction of Segregation Shed and Community Compost Pit at K.N.Savulur H/O K.Naduhalli — Civil Works & Infrastructure · Tamil Nadu · ₹4.0L
- Repair of street and drainage in w.no.2 — Civil Works & Infrastructure · Punjab · ₹25.0L
- Repair and renovation of University Library Building at GADVASU, Ludhiana. — Civil Works & Infrastructure · Punjab · ₹9.5L
- P/F Interlocking Tiles St. Baba Jora EO Gurudwara Street Ward No.07 — Civil Works & Infrastructure · Punjab · ₹3.4L