Construction of northern side of boundary wall with barbed wire fencing of Area Store of Kunustoria Area
Eastern Coalfields Limited · Kunustoria area · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹17.6L
- EMD: ₹22K
- Published: 24 Sep 2026
- Closing date: 05 Oct 2026
- Status: open
- Office: Kunustoria Area
Description
Construction of northern boundary wall with barbed wire fencing at Kunustoria Area Store, including earthwork, concrete work, brick work, steel reinforcement, plastering, fencing, and related civil works.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Open Tender
- Evaluation: Percentage
- Make in India (MII): No
- MSE preference: No
Line items (16)
- Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. — Qty: 77.76 cum
- Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. — Qty: 5.18 cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) — Qty: 6.19 cum
- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) — Qty: 19.827 cum
- Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) — Qty: 13.973 cum
- Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. — Qty: 2302.34 kg
- Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. — Qty: 342.72 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers — Qty: 84.53 sqm
- Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) — Qty: 20.25 cum
- Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :Cement mortar 1:6 (1 cement : 6 coarse sand) — Qty: 50.313 cum
- 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) — Qty: 537 sqm
- Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar — Qty: 48.263 cum
- 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) — Qty: 103.5 sqm
- Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. — Qty: 162 kg
- Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earthwork and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire — Qty: 450 m
- Total impact of GST for the purpose of CTC — Qty: 1 Nos
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- NAGAR PANCHAYAT NYOTANI UNNAO KE WARD JAVAHAR NAGAR ME SHAUKAT ALI KI DUKAN SE MUNNA KE DUKAN TAK CC ROAD VA NALI NIRMAN KARYA — Civil Works & Infrastructure · Uttar Pradesh
- Proposed compound wall construction at Ganapathy colony Main road NNMP shed in div 122, unit 26, zone-9 — Civil Works & Infrastructure · Tamil Nadu · ₹2.7L
- Repair Works to Radha Krishna HOR at NITW — Civil Works & Infrastructure · Telangana · ₹9.1L
- Prabhag Kr. 24 D , Magalwar, Kasaba Peth Madhe Vividh Thikani Drainage Lines Chambers Durusti Karane — Civil Works & Infrastructure · Maharashtra · ₹8.4L
- Operation and maintenance of Borewell 21 Nos for 12 Months in Ward No 46 Central Zone — Civil Works & Infrastructure · Tamil Nadu · ₹12.6L
- Providing Installation of 01 Nos 1000 LPH RO water supply system for 59 BSF under under SHQ BSF Krishnanagar — Civil Works & Infrastructure · ₹9.8L
- Performance Base Maintenance works (PBMC) on section from Km 57.600 to 80.600 of Ambikapur Ramanujganj Garhwa Road N.H-343 in the state of Chhattisgarh — Civil Works & Infrastructure · Chhattisgarh · ₹17.9Cr