Construction of new Drain from Bougainvillea Garden to H/O Md. Umar Sharrif under HMC ward no .46
Howrah Municipal Corporation · West Bengal · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹1.7Cr
- EMD: ₹3.3L
- Published: 30 Sep 2026
- Closing date: 23 Oct 2026
- Status: open
- Status as of: 06 Oct 2026 06:23 UTC
- Department: Municipal Affairs Department
Description
Construction of a new drain from Bougainvillea Garden to H/O Md. Umar Sharrif under HMC ward no.46, including dismantling, earthwork, brickwork, concrete, plastering, and other civil works, with an estimated value of 16,676,606 INR. The project involves various civil construction activities with detailed specifications and quantities.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Make in India (MII): No
- MSE preference: No
Line items (25)
- Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. — Qty: 49 Cu.M.
- Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. (upto 150 mm. thick) — Qty: 23 Cu.M.
- Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. a) in ground floor including roof — Qty: 5 Cu.M.
- Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1,500 mm. — Qty: 3438 %Cu.M.
- Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. — Qty: 370 %Cu.M.
- Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. — Qty: 2956 Sq.M.
- Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion — Qty: 371 Cu.M.
- 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. — Qty: 257 Sq.M.
- Brick work with 1st class bricks in cement mortar (1:4) in foundation and plinth — Qty: 1113 M3
- Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor). a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. — Qty: 482 Sq.M.
- Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL — Qty: 9.3 M.T.
- Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety — Qty: 73 Cu.M.
- Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). (ii) With 1:4 cement mortar. a) 20 mm thick plaster — Qty: 6004 Sq.M.
- Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE: Cement 0.152 cu.m per 100 sq.m. — Qty: 6004 Sq.M.
- Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement. (ii) 25 mm. thick — Qty: 1346 M2
- Supplying, fitting and fixing in position FRP/GRP/COMPOSITE UV stabilizer Gully Pit Cover with high abrasion surface of 7mm top thickness, density of 2KG/m³ of approved make with rim of approved make (Heavy type). (i) 40 M.T. Gully pit cover (yard gully) with arrangement for Frame Clear Opening 640 mm X 240 mm. Cover Out to Out 700 mm X 300 mm — Qty: 65 Nos.
- Supply of empty cement bags in good condition. — Qty: 1000 %Nos.
- Labour for filling up cement bags with sand and placing them up in position including tying and sewing mouth (cost of thread included) and all incidental charges complete but excluding cost of sand and sunny bags. — Qty: 1000 %Nos.
- Supply of silver sand. — Qty: 30 M3
- Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc. etc. from road side masonary drain/ hume pipe drain/ culvert etc. by mortar labour after removing concrete. Slab/manhole cover etc. without damaging the same and refixing the same properly after cleaning as necessary and removing the sludge etc. etc. by using iron pans, buckets including all labour, tools & plants including removing the spoils in dry condition and disposing the same by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the roadside in all respects as per direction of the Engineer-in-Charge. — Qty: 20 Cum.
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- imp. Sarvice lane With Nali from Juhi lal colony in Block No 315/4 Block No 317 in ward 84 Zone 3 — Civil Works & Infrastructure · ₹8.3L
- GENERAL REPAIR WORK AT JOINT DIRECTOR SECONDARY EDUCATION OFFICE UDAIPUR — Civil Works & Infrastructure · Rajasthan · ₹15.0L
- 4 NARSAR KARAHIYA SAMPARK MARG SE JUNIOR HIGH SCHOOL TAK PITCH MARG KA LEPAN ANURAKSHAN (SAMANYA MARAMMAT) KARYA.(HOT MIX) — Civil Works & Infrastructure · Uttar Pradesh · ₹15.3L
- Laying RMC M40 in various streets of transport nagar ward no. 30 — Civil Works & Infrastructure · Punjab · ₹1.8Cr
- Estimate For Laying 315mm Dia UPVC U/G Pipe Line For Outlet RD 13350/R of Shahpurkandi Channel No.3 For Year 2026-27 — Civil Works & Infrastructure · Punjab · ₹51.7L
- In Ward-30 Govind Vihar II, work of drain and interlocking tiles from Harendra house to Omendra house and Pravesh house, Sundar house — Civil Works & Infrastructure · ₹19.1L
- purani nagar panchayat ke sthan par shoping complex cum office dukan no 05 — Civil Works & Infrastructure · Madhya Pradesh · ₹8.0L