Construction of New Double Line between New Palghar & Vadhavan Port (Varor Station) including Electrification works in Mumbai Division of Western Railway
Western Railway · Maharashtra · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹734.4Cr
- EMD: ₹14.7Cr
- Published: 16 Jun 2026
- Closing date: 14 Oct 2026
- Status: open
- Ministry: Ministry of Railways
- Department: Western Railway
- Office: CAO-C-CCG-ENGINEERING/WESTERN RLY
Description
Tender for construction of a new double railway line between New Palghar and Vadhavan Port (Varor Station), including electrification works, in Mumbai Division of Western Railway. The project involves civil works such as earthwork excavation, concrete laying, and track infrastructure, with an estimated value of approximately 7.34 billion INR. The tender is open, single-stage EPC, with a completion period of 30 months, and includes pre-bid conferences scheduled for July 13 and July 31, 2026.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
Commercial terms
- Bid type: Single Stage
- Evaluation: Single Rate for Each Schedule
- Make in India (MII): No
- MSE preference: No
Line items (6)
- Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. — Qty: 218.45 cum
- Earthwork in excavation for foundations and floors of bridges, retaining walls, etc. (Soft rock) — Qty: 229.96 cum
- Earthwork in excavation for foundations and floors of bridges, retaining walls, etc. (Hard rock) — Qty: 229.96 cum
- Providing and laying in position Plain cement concrete for miscellaneous works — Qty: 1615.33 cum
- Providing and laying in position machine batched, mixed, and vibrated cement concrete of specified grade — Qty: 9360.69 cum
- Other miscellaneous items (e.g., reinforcement, shuttering, etc.) — Qty: 100 Each
20 tender document(s) available — sign up to download.