Construction of infrastructure at Nelong AOR 35 Bn ITBP
DG, Indo-Tibetan Border Police Force · Nelong Valley, Uttarakhand · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹1.8Cr
- EMD: ₹3.7L
- Published: 18 Sep 2026
- Closing date: 10 Oct 2026
- Status: open
Description
Construction of infrastructure at ITBP location Nelong situated in Nelong Valley approx. 11614 ft and 126 km from 35 BN ITBP Mahidanda UKD connected by metalled road SH Accommodation and Office
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage
- Make in India (MII): No
- MSE preference: No
Line items (30)
- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. — Qty: 333.06 cum
- Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. — Qty: 71.82 cum
- Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. — Qty: 77.59 cum
- Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. — Qty: 13.69 cum
- Excavating trenches by mechinical / manual means of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, for all depth, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil, Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia — Qty: 20 metre
- Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. — Qty: 188.79 cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) — Qty: 1.58 cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) — Qty: 21.76 cum
- Providing and fixing up to floor five level precast cement concrete solid block, including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centering, shuttering complete : 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). — Qty: 23.79 cum
- Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) — Qty: 75.8 cum
- Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) — Qty: 40.31 cum
- Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). — Qty: 29.45 cum
- Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete — Qty: 123.12 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. — Qty: 165.24 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform — Qty: 128.54 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for : Shelves (Cast in situ) — Qty: 4.5 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers — Qty: 309.41 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts — Qty: 158.4 sqm
- Centering and shuttering including strutting, propping etc. and removal of form for : Edges of slabs and breaks in floors and walls Under 20 cm wide — Qty: 86.9 metre
- Centering and shuttering including strutting, propping etc. and removal of form for : Weather shade, Chajjas, corbels etc., including edges — Qty: 11.02 sqm
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Road renovation work on the Fatehpur Minor from km 2.600 to km 5.400 — Civil Works & Infrastructure · Uttar Pradesh
- Constuction of Community Compost Pit at Purkhu Panchayat Kot Lower A Khass Block Bhalwal — Civil Works & Infrastructure · Jammu and Kashmir · ₹36K
- NAGAR PANCHAYAT NYOTANI UNNAO KE WARD JAVAHAR NAGAR ME SHAUKAT ALI KI DUKAN SE MUNNA KE DUKAN TAK CC ROAD VA NALI NIRMAN KARYA — Civil Works & Infrastructure · Uttar Pradesh
- Proposed compound wall construction at Ganapathy colony Main road NNMP shed in div 122, unit 26, zone-9 — Civil Works & Infrastructure · Tamil Nadu · ₹2.7L
- Repair Works to Radha Krishna HOR at NITW — Civil Works & Infrastructure · Telangana · ₹9.1L
- Prabhag Kr. 24 D , Magalwar, Kasaba Peth Madhe Vividh Thikani Drainage Lines Chambers Durusti Karane — Civil Works & Infrastructure · Maharashtra · ₹8.4L
- Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - GRAM PANCHAYAT DAM — Civil Works & Infrastructure · Bihar · ₹2.0L