Construction of Four-Lane access control Arwal Bypass from km 54.200 To Km 66.500 (Design ch. 67.680) of existing NH-139 on Naubatpur- Hariharganj Road in the State of Bihar under EPC Mode.
Ministry of Road Transport & Highways · Patna, Bihar · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹269.5Cr
- EMD: ₹2.7Cr
- Published: 30 Jul 2026
- Closing date: 19 Nov 2026
- Status: open
- Status as of: 20 Oct 2026 23:24 UTC
- Ministry: Ministry of Road Transport & Highways
- Department: Road Construction Department, Bihar
- Office: Office of Regional Officer, Ministry of Road Transport & Highways, Patna
Description
Construction of a 13.48 km four-lane access-controlled Arwal Bypass on NH-139 in Bihar under EPC mode, including design, engineering, procurement, construction, and maintenance during the 5-year Defect Liability Period. Estimated project cost is Rs. 269.53 crore excluding GST; construction period is 24 months.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Certifications: Statutory auditor or cost auditor certificate, or practicing Cost Accountant or Chartered Accountant certificate, stating percentage of local content for procurement value exceeding Rs. 10 crores
- Documents required: Technical Bid, Financial Bid, Bid Security, Power of Attorney for signing the Bid, Power of Attorney for Lead Member of Joint Venture, if applicable, Joint Bidding Agreement for Joint Venture, if applicable, Integrity Pact, Experience certificates apostilled at foreign origin, if applicable, Class-I local Supplier / Class-II local Supplier self-certification with local value addition locations
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Single stage two-part system (Technical Bid and Financial Bid)
- Evaluation: Lowest cost required by a Bidder for implementing the Project; Lowest Bidder
- Make in India (MII): Yes
- MSE preference: No
3 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- imp. Sarvice lane With Nali from Juhi lal colony in Block No 315/4 Block No 317 in ward 84 Zone 3 — Civil Works & Infrastructure · ₹8.3L
- GENERAL REPAIR WORK AT JOINT DIRECTOR SECONDARY EDUCATION OFFICE UDAIPUR — Civil Works & Infrastructure · Rajasthan · ₹15.0L
- 4 NARSAR KARAHIYA SAMPARK MARG SE JUNIOR HIGH SCHOOL TAK PITCH MARG KA LEPAN ANURAKSHAN (SAMANYA MARAMMAT) KARYA.(HOT MIX) — Civil Works & Infrastructure · Uttar Pradesh · ₹15.3L
- Laying RMC M40 in various streets of transport nagar ward no. 30 — Civil Works & Infrastructure · Punjab · ₹1.8Cr
- Estimate For Laying 315mm Dia UPVC U/G Pipe Line For Outlet RD 13350/R of Shahpurkandi Channel No.3 For Year 2026-27 — Civil Works & Infrastructure · Punjab · ₹51.7L
- In Ward-30 Govind Vihar II, work of drain and interlocking tiles from Harendra house to Omendra house and Pravesh house, Sundar house — Civil Works & Infrastructure · ₹19.1L
- purani nagar panchayat ke sthan par shoping complex cum office dukan no 05 — Civil Works & Infrastructure · Madhya Pradesh · ₹8.0L