CONSTRUCTION OF CONTROL ROOM BUILDING AT 190MVA 132/33 KVA GRID SUB STATION AT WANPOH ON EXISTING BUILDING
Chief Engineer, System and Operation Wing Kashmir · Wanpoh, Jammu and Kashmir · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹2.0Cr
- EMD: ₹3.9L
- Published: 19 Oct 2026
- Closing date: 10 Nov 2026
- Status: open
- Status as of: 28 Oct 2026 09:14 UTC
- Department: Power Development Department
- Office: TLMD-II Pampore
Description
Construction of a control room building at the 190MVA 132/33 KVA Grid Sub Station at Wanpoh, including demolition, foundations, reinforced concrete, masonry, structural steel, roofing and associated building works.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Percentage BoQ
- Make in India (MII): No
- MSE preference: No
Line items (145)
- Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar — Qty: 271.3 Cum
- Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within 50 meters lead a) Of area of 3 sqm. and below Of area beyond 3 sqm. — Qty: 13 No
- b) Big windows — Qty: 2 No
- Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. — Qty: 11248 Kg
- Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge — Qty: 25 Cum
- Engagement of Labor for site Clearance and al;l work as per the direction sof incharge engineer at site — Qty: 10 Lab
- Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil — Qty: 196.63 cum
- Boring, providing and installing bored cast-in-situ reinforced cement concrete pile of specified grade concrete M30 design mix, 450mm diameter and 15m length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embeded in the pile cap etc. all complete including removal of excavated earth with all lifts and leads(Length of pile for payment Shall be measured from top of shoe to the bottom of pile cap) By percussion drilling using Direct mud circulation (DMC) or Bailer and chisel technique by tripod and mechanical Winch Machine all complete, 450 mm dia piles — Qty: 900 RMT
- Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor pile method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer-in Charge. Routine test (Test Load 1.5 times the safe capacity) — Qty: 1 Job
- Providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. — Qty: 25.91 Cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 (1Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size) — Qty: 19.56 Cum
- Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. All works upto plinth level — Qty: 48.6 Cum
- Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) — Qty: 26.39 Cum
- Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) — Qty: 29.24 Cum
- Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with:1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) — Qty: 30.96 Cum
- Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:2:4 (1Cement: 2 fine sand: 4 grade stone aggregate 20mm nominal size) — Qty: 10.07 Cum
- Centering and shuttering including strutting propping etc. removal of form work in Foundations, footings, bases of columns etc. for mass concrete. — Qty: 148.5 Sqm
- Centering and shuttering including strutting propping etc. removal of form work in Columns, pillars, piers, abutments, posts and struts. — Qty: 273.78 Sqm
- Centering and shuttering including strutting propping etc. removal of form work in Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc — Qty: 85.92 Sqm
- Centering and shuttering including strutting propping etc. removal of form work in Lintel, beams, plinth beams, girders, bressumers and cantilevers — Qty: 313.9 Sqm
1 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Operation of supply valves for the distribution pipe line for piped scheme Babaichya and Narwar with associated works, under jurisdiction of sub division rural, District Rural Division Ajmer (Excluding GST) — Civil Works & Infrastructure · Rajasthan · ₹3.3L
- Construction of Mali Hut at Bimalnag Nursery under CAMPA CAT RATTLE for the year 2026 27 — Civil Works & Infrastructure · Jammu and Kashmir · ₹16.7L
- CONSTRUCTION OF TOILET BLOCK IN SANOUR CITY — Civil Works & Infrastructure · Punjab · ₹9.1L
- Construction of Segregation Shed and Community Compost Pit at K.N.Savulur H/O K.Naduhalli — Civil Works & Infrastructure · Tamil Nadu · ₹4.0L
- Repair of street and drainage in w.no.2 — Civil Works & Infrastructure · Punjab · ₹25.0L
- Repair and renovation of University Library Building at GADVASU, Ludhiana. — Civil Works & Infrastructure · Punjab · ₹9.5L
- P/F Interlocking Tiles St. Baba Jora EO Gurudwara Street Ward No.07 — Civil Works & Infrastructure · Punjab · ₹3.4L