Construction of Cement Concrete road of 2 lane with paved shoulder configuration from Km. 168.180 Shitala Mata Mandir to Km 168.920 Railway Crossing Total Length - 740 m on Bhandara-Khat-Ghotitok Road NH-247 in the state of Maharashtra
Government of Maharashtra · Maharashtra · Civil Works & Infrastructure · open
Key facts
- Tender value: ₹9.6Cr
- EMD: ₹9.7L
- Published: 08 Aug 2026
- Closing date: 21 Sep 2026
- Status: open
- Ministry: Ministry of Road Transport and Highways
- Department: Public Works Department (NH), Maharashtra
- Office: Secretary, National Highways (P.W.), Maharashtra
Description
The tender involves the construction of a 2-lane cement concrete road with paved shoulders over a length of 740 meters on NH-247 in Maharashtra, under an EPC contract. The estimated cost is approximately 96.47 million INR, with a bid security of 9.65 lakh INR. The project duration is 6 months including monsoon, with a 10-year defect liability period.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
New to these terms? Read how tender eligibility criteria work.
Commercial terms
- Bid type: Open Tender
- Make in India (MII): No
- MSE preference: No
Line items (1)
- Construction of Cement Concrete road of 2 lane with paved shoulder configuration from Km. 168+180 (Shitala Mata Mandir) to Km 168+920 (Railway Crossing) — Qty: 740 meter
5 tender document(s) available — sign up to download.
Related tenders
- UNDER FRAME (LS & LWS PP) — Civil Works & Infrastructure · Tamil Nadu
- Wedge. — Civil Works & Infrastructure
- Operation & Maintenance of Water Treatment Plant and Distribution System at Nadia District — Civil Works & Infrastructure · West Bengal · ₹3.5Cr
- Providing and Fixing of V-Notch at Omkareshwar Power Station — Civil Works & Infrastructure · ₹2.4L
- PARTIAL RENOVATION OF 6 NOS. OF TOILET AT THE MAIN BUILDING OF BRIC-NIBMG CAMPUS, KALYANI, NADIA — Civil Works & Infrastructure · ₹9.8L
- Repair and Renovation of Project Dispensary, Sub-station building at Samdong Colony and providing rain shed above staircase at Samdong and Dikchu Transit camp of Teesta V Power Station, Sikkim. — Civil Works & Infrastructure · Sikkim · ₹28.4L
- two incline with slope of 15 degree height 4 ft and width 3.5 ft and 14 ft length,two jointed recta — Civil Works & Infrastructure · ₹5.0L
- Operational Shelter for Field Area — Civil Works & Infrastructure