Study on No increase in Pollution Load on installation of 400 MWh Battery Energy Storage System at NTPC BARH
NTPC Limited · Raipur · Power Generation & Renewable Energy · open
Key facts
- Closing date: 13 Jul 2026
- Status: open
- Ministry: Ministry of Power
- Office: Ussc Cpg2 Raipur
Description
Bid for a study on pollution load related to the installation of a 400 MWh Battery Energy Storage System at NTPC BARH, including operation and maintenance, with a contract period of 3 months. The bid includes technical specifications, eligibility criteria, and payment terms.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Documents required: Turnover Criteria, Supporting documents for exemption
Commercial terms
- Bid type: Packet Bid
- Evaluation: value wise evaluation
- Make in India (MII): No
- MSE preference: Yes
Line items (1)
- Study on No increase in Pollution Load on installation of 400 MWh Battery Energy Storage System at NTPC BARH
9 tender document(s) available — sign up to download.