Solar Power Plant (Roof Top) for ONGRID System, Three Phase
Indian Army · Ajmer · Power Generation & Renewable Energy · open
Key facts
- EMD: ₹65K
- Closing date: 06 Jul 2026
- Status: open
- Ministry: Ministry of Defence
- Department: Department of Military Affairs
Description
Tender for supply and installation of 2 rooftop solar power plants for ONGRID system, three phase, with technical specifications including inverter power, operating voltage, IP rating, mounting type, and other components. The project is under the Ministry of Defence, Department of Military Affairs, Indian Army, with a bid validity of 90 days from the end date, and scheduled bid opening on 06-07-2026.
Eligibility & requirements
- Experience required: 3 years
- Past performance: 50%
- Startup relaxation: Yes
- MSE relaxation: Yes
- Certifications: OEM Authorization Certificate
- Documents required: Supporting documents for experience and turnover exemption, CRAC or relevant supply certificates
Commercial terms
- Bid type: Packet Bid
- Evaluation: value wise evaluation
- Make in India (MII): Yes
- MSE preference: Yes
Line items (1)
- Solar Power Plant (Roof Top) for ONGRID System, Three Phase — Qty: 2 Set
1 tender document(s) available — sign up to download.