Solar Power Plant (Roof Top) for ONGRID System, Single Phase
East Central Railway · Power Generation & Renewable Energy · awarded
Key facts
- Closing date: 24 Jun 2026
- Status: awarded
- Ministry: Ministry of Railways
- Department: Indian Railways
- Office: Ecr Stores
Description
Tender for supply and installation of a 1 MW grid-tied rooftop solar power plant with specified technical features, to be supplied to East Central Railway, Ecr Stores, under the Ministry of Railways, Indian Railways.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Certifications: Udyam Certificate
- Documents required: Turnover Criteria, Supporting documents for exemption
Commercial terms
- Bid type: Single Packet Bid
- Evaluation: value wise evaluation
- Make in India (MII): No
- MSE preference: Yes
Line items (1)
- Solar Power Plant (Roof Top) for ONGRID System, Single Phase — Qty: 1 Piece
1 tender document(s) available — sign up to download.