HAZOP study for the entire Thermal power plant process of NTPC
NTPC Limited · Raipur, Chhattisgarh · Other · open
Key facts
- Published: 20 Jul 2026
- Closing date: 30 Jul 2026
- Status: open
- Ministry: Ministry Of Power
- Office: Ussc Cpg2 Raipur
Description
Tender for conducting HAZOP study for the entire thermal power plant process of NTPC Singrauli, including operation and maintenance of power house, with a contract period of 6 months. The bid involves services, technical compliance, and purchase preference for MSEs, with a bid validity of 120 days from the end date.
Eligibility & requirements
- Startup relaxation: No
- MSE relaxation: No
- Documents required: Turnover Criteria, Experience Certificates
Commercial terms
- Bid type: Packet Bid
- Evaluation: value wise evaluation
- Make in India (MII): No
- MSE preference: Yes
Line items (1)
- Hazop Study Service — Qty: 1 Lot
10 tender document(s) available — sign up to download.