← Back to tenders

Grid Compliance study of 140 MW DC / 100 MW AC Solar Power Plant

Hpcl Renewable And Green Energy Ltd · Mumbai, Maharashtra · Construction Materials · open

Key facts

Description

Tender for services related to grid compliance study for a 140 MW DC / 100 MW AC solar power plant, including design, supply, installation, and commissioning, with a contract period of 3 months. The tender includes requirements for regulatory compliance, technical evaluation, and financial guarantees such as EMD.

Eligibility & requirements

Commercial terms

Line items (1)

5 tender document(s) available — sign up to download.

Browse more GeM tenders